ML19253A827

From kanterella
Jump to navigation Jump to search
Forwards Final Deficiency Rept Re Failure of Matl Used in Pipe Fittings
ML19253A827
Person / Time
Site: Waterford 
Issue date: 08/31/1979
From: Aswell D
LOUISIANA POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19253A828 List:
References
LPL-11904, NUDOCS 7909110469
Download: ML19253A827 (1)


Text

.

l 0UISIANA

& L i G H T! p,42 caineNee se o 80x Soce. NEW CALEANt LOUISIANA 70174. (5041 366-2345 POWER 3EEN spsg s

August 31, 1979

L 33,,LL a, e-m.-tmm. max
en LPL 11904 Q-3-A35.07.12 3-A1.01.04 Mr. K. V. Seyfrit, Director, Region IV U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

SUBJECT:

Waterford SES Unit 3 Docket No.59-382 Final Report of Significant Conetruction Deficiency No. 12

" Material railure - Pipe Fittings -

4" - 45 Ell and 4" - 90 Ell" Dear Mr. Seyfrit-In accordance with the requirements of 10CF"50.55'e), we are submitting two copies of the final report for the subject Signiftcant Construction Deficiency.

Yours very truly, D. L. Aswell DIA : TFG : smd Enclosure ec:

1) Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 f.- 7'":r)

>'I

(with 15 copies of report) 2)

Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555

'")

(with one copy of report) 7909110