ML19253A785

From kanterella
Jump to navigation Jump to search
Notice of Issuance & Availability of Amends 44 & 39 to Licenses DPR-19 & DPR-25,respectively & Amends 53 & 50 to Licenses DPR-29 & DPR-30,respectively
ML19253A785
Person / Time
Site: Dresden, Quad Cities  
Issue date: 08/13/1979
From: Ippolito T
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19253A764 List:
References
NUDOCS 7909110322
Download: ML19253A785 (2)


Text

.

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NOS. 50-237, 50-249, 50-254 AND 50-265 COMMONWEALTH EDISON COMPANY AND IOWA-ILLIN0IS GAS AND ELECTRIC COMPANY NOTICE OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES The U. S. Nuclear Regulatory Comission (the Commission) has issued Amendments Nos. 44 and 39 to Facility Operating L: censes Nos. DPR-19 and DPR-25, issued to Comonwealth Edison Company, which revised the Technical Specifications for operation of the Dresden Nuclear Power Station, Units Nos.

2 and 3, located in Grundy County, Illinois. The Commission has also issued Amendments Nos. 53 and 50 to Facility Operating Licenses Nos. DPR-29 and DPR-30, issued to Commonwealth Edison Company and Iowa-Illinois Gas and Electric Company, which revised the Technical Specifications for operation of the Quad-Cities Nuclear Power Station, Units Nos. I and 2, located in Rock Island County, Illinois.

The amendments become effective as of the date of issuance.

The amendments modify the Technical Specifications to change the withdrawal schedules of the pressure vessel material surveillance capsules to be in accordance with 10 CFR 50, Appendix H.

The application for the amendments complies with the standards and require-ments of the Atomic Energy Act of 1954. as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Comission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendments.

Prior public notice of these amendments was not required since the amencments do not involve a significant ha:ards consideration.

g., c..m bdanau 7909110

)

7590-Oi The Commission has determined that the issuance of these amendments will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement, or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of these amendments.

For further details with respect to this action, see (1) the application for amendments dated May 16, 1977, as supplemented November 3,1978,(2)

Amendment No. 44 to License No. DPR-19, Amendment No. 39 to License No. DPR-25, Amendment No. 53 to License No. DPR-29, and Amendment No. 50 to License No.

DPR-30, and (3) the Commission's related Safety Evaluation.

All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, N. W., Washington, D. C., and at the Morris Public Library, 604 Liberty Street, Morris, Illinois, for Dresden 2 and 3, and at the Moline Public Library, 504 - 17th Street, Moline, Illinois, for Quad Cities 1 and 2.

A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D. C.

20555, Attention:

Director, Division of Operating Reactors.

Dated at Bethesda, Maryland, this 13th day of August 1979.

FOR THE NUCLEAR REGULATORY C0FNISSION 0gY,4 ThomaV% Ippclit'o', Chief Operating Reactors Eranch d3 Division of Operating Reactors 4

n ':S 7, e. t.

exur v