Requests Comments by 790405 on Util Agenda for 790404 Daily Meeting.Util 790404 Memo Encl
ML19253A453
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/04/1979
From: Vollmer R
Office of Nuclear Reactor Regulation
To: Jay Collins, Kreger W, Mazetis G
Office of Nuclear Reactor Regulation
References
NUDOCS 7909100032
Download: ML19253A453 (5)


Text

x April 4, 1979 g

NM NOTE TO:

J. Collins W. Kreger G. Mazetis T. Novak Please give me any notes appropriate to attached material by 9:30 A.M. on April 5, 1979 Dick Vollmer cc:

R. Mattson /

V. Stello D. Ross 931312 7909100,0 9

'O h.

METROPOLITAN EDISON COMPANY ses.3, y ac,,,,i u.c uonn., co,.m nos Subject DAILY PLANNING MEETING Location TMI Date April 4, 1979 To DISTRIBUTION JGH Memo #

location:

Trailer #22 Time:

10:00 a.m.

Daily The above meetings are being initiated in order to more effectively coor-dinate activities, assign task responsibilities and obtain general agree-ment on the activities for the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period following each meeting.

It is intended that these meetings will be reasonably short.

Thus, it is important that attendees come prepared to discuss the agenda items and have reasonable alternatives for those they feel are objectionable.

Any attendee vanting to place an item on the agenda should contact the scheduling group in Trailer #21 prior to 8:00 a.m. the day of the par-ticular meeting of concern.

Such items should include a short statement of the activity of concern and an indication of the priority the items should be given.

It is expected that those in attendance will have the necessary authority to approve the daily plan and they will be expected to sign the plan for succeeding 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period.

Attached is a list of activit ies to be discussed at the next ceeting.

$V J.

G. HEP 3EIN

j fg cc:

W.

Creit:

J.

G. Herbein - 2 copies G. P. Miller /J.

B.

Log an B._Craber JD. Rog Vollmer)

W.

Cunn R. C. Arnold / R.

F. Wilson R. J. Toole/J. Sheehan D. M. Shovlin J.

L. C.

Bachoffer J.

Devine J.

T. Faulkner D.

E. Hetricle Observation Center Hd. Qt r s.

File - Trailer # 21-P&S nyao5o usv s.,

INTER-0 F FICE ME.*.*0 R AND UM

DAILY PLANNING MEETING AGENDA April 5, 1979 ITEM TASK DATE NO.

COORD.

DESCRIPTION / STATUS REQUIRED

1. A.

Miller / Ops.

Eugas RCS w/ Plant in current Est complete 5 days mode of operation (4-8-79)

B.

J.

Dev ine How do we track rate of Degas.

W oi t e eadys t s of p a sstrM nois e - E.7 2.

Miller / Ops.

Continue to Run No. 2H2 Recombiner Wo rking 3.

Miller / Chem.

a. Robot Per formance Tes t i for De l a yed - c an ' t get RCS samples, in Dev ine
b. Determine Requirements for Primary Sample 4.

Radwa s t e Mgm t.

Hook-up Solidification Truck for Gro up/ Too l e Radwas t e. Need hose Tie Think Tank / Rad Con / Plant Staff 6

/

5.

Gunn/ Miller Define Need for N2 - Backup supply p

6 Devine De s ign/ Fab. Instl. Shield Plugs at f

/GPU Engr.

DH/3S vaults in Aux. Bui ld ing.

(,

7. A.

Gunn Cond. Storage Tanks Require Liquid Was t e - Removal-via truck (Determine need for shield wall at condensate demin s).

B.

Radwaste g gC Comm it.t e e / Too l e Get Method to Process 8.

Chris tman/ Shovlin Improve shut tle service for f'

In-Pl an t Employees to/from TML p

site.

p 9.

Miller / Porter a.

Re"iew list of Proc. and determine status of each (i.e., not req'd, on-hold schedule, in progress, to PORC, NRC, issued)

Miller b.

Review De generat ion list each shift change w/ operator 10.

Gunn/ Ca t alyt ic Cl e a r ',ca s e. at south end of 2 days site for storage of GPU rec 'd materials - Logistics group will set up of fice.

o

.y n

=> t.I, l d l ' ?

ITEM TASK DATE NO.

COORD.

DESCRIPTION / STATUS REQUIRED 11.

Cunn/B&R Design / install additional waste Issue Partial gas hold up facility at 3WST area Eng. 4/4 for for tie-in to WDG - ECM - Issued found at ion and b'

ck wall 12.

Cunn/B&R a.

Design / Install tank farm with Concept ual shield walls to act as processing design on site system. - 1 PM Meeting for review Acnold

b. Review requirements & scope with y 74ANTLp2 NRC 0

g j b bbLd E 13.

Miller / Dub iel Sample air around aux. b1dg. sump to see if it should be covered.

oysgAou 14.

Miller / Ops.

Test on PZR Level - Prepare procedure

& Equipment.

Loss of 2nd level indicator - Go on Heisegage.

15.

Devine MU Tank & Waste Cas Decay Vent Verify MU Tank Line Design a.

b.

Verify Decay Tank Line Design 16.

Herb e in EWT sump to be discharged 17.

Shovlin FH/ A3 Vent Filters-a.

Charcoal - determine available inventory Shov lin b.

HEPA Filters -

Miller c.

Sample to determine need for filter replacement Dev ine B&R/Cobean d.

Provide alternate set of filters 18.

Miller /J. Colitz Co-ord. personnel to limit exposure of aux. operators 19.

Dev in u a.

Determine if caustic can be used in AB Sump to maint ain ac c e pt ab le Iod ine limits.

Devine b.

Determine source of Iodine Shovlin c.

Cover the A3 Sump Miller d.

Resample for Iodine Devine e.

Analysis o f exist ing condit ions.

o -> s n ~ :~

kJ h i b ' k e_ )

ITEM TASK DATE NO.

COORD.

DESCRIPTION / STATUS REQUIRED 20.

N /Gunn Responsibility for design of filters for vacuum pump, 21.

Chr is tman/ Arno ld Describe organizational re-sponsibilities (overall).

22.

Arnold Game plan for use of DH sys, as cooldown mode, if required.

23.

Dev ine / Wall ac e RMS De-sensitization 24.

Miller Provide redundant power for RC-V137 & RC-V2 - Prepare DON'T INSTALL.

25.

Miller / Dub iel Update emergency plan for measuring high iodine levels.

26.

Cevine SS R/ Cob ean Make seismic analysis of =ain steam lines.

27.

Miller /Limrock Develop access list to Island Security on Island Fire Fighting.

28.

Cevine What is structual concerns on h [OU #

R3 under vacuum.

ellS cab )

JUh' p 29.

Lionel Bannon Th e rmocouple s from Incores

- n Neutron s ignals from Inc o r e s.

[

[J 30.

Arnold Provide cont ingency e f fort g

co-ordination.

31.

Mc Goe y/ GPU Int ermed iat e and long range radioactive waste gas and liquid overall planning and coordination.

3313IG

l(

}t W

_u

/

c~swt Lt g

7k~llwr T. Novak G. Mazetis C. Berlinger A. Thadan [i W. Kreger T. Murphy V.

Benaroya J. Collins Please give me any notes appropriate to attached. agenda by 9:30 A.M. on April I/, 1979.

Dick Vollmer cc:

R. Mattson

/i d V. Stello y

b D

D oa O

g~

~

g S_A_

o

_a

.o,3 3 s,.,

.