Responds to 790515 Telegram Re Assistance Given to NRC, Commonwealth of PA or Util.Provided Air Distribution Manifolds & Reactor Physics Calculations
ML19253A342
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/25/1979
From: Standerfer F
ENERGY, DEPT. OF
To: Ferguson R
ENERGY, DEPT. OF
References
NUDOCS 7908210383
Download: ML19253A342 (3)


Text

..

/% kf A I

t H

i i Department of Energy

,l Richland Operations Office

[ *.

P.O. Box 550 Richland. Washington 90352 MAY 2 5 IS73 f

1

,t i5 R. L. Ferguson Program Director 6

i~

Office of Nuclear Energy Programs. HQ w

Pe INFORMATION REQUESTED BY TiiE PRESIDENT'S COMMISSION ON THREE' HILE I;

ISLAND As requested by your TWX to A. G. Fremling, Manager of RL, on May 15.

1979, subject as above. infomation on RL or RL contractor assistance to the NRC. State of Pennsylvania, or to the utility company following

/

I W

.the Three Mile Island Accident is provided in the enclosure to this

9 r m randum. While RL and RL contractors have received numerous contacts

' rom DOE, NRC and the utility company, to discuss Hanford capabilities.

.~

the only actual assistance provided this far is as noted in the enclo-T-

sure. I have established a single point of contact at RI. (J. D. White) to coordinate any new or continuing activities related to the Three Mile e-Island accident and we have advised our prime contractors of this action.

' f:

~

/

i' F. R. Standerfer Asustant Mar.ager NFCP:J0W for lechnical Operations Enclosure cc:

H. Feinroth, ET-HQ, w/ encl.

i i rl T.

790821038 3 802 330 o

?u i

..?

ASSISTANCE PROVIDED BY RL AND RL CONTRACTORS TO THE NRC. STATE OF PENNSYLVANIA. OR THE UTILITY COMPANY FOLLOWING THE ACCIDENT M

~

AT THREE MILE ISLANC (TMI)

EI!

~

E.t f,1 P_rovision of Air Distribution Manifolds W

1.

Two breathing air distribution manifolds, plus extra filters and 7

spara parts, were provided to Metropolitan Edison Company on E'

April 17.1979. The estimated value of the equiptent was 51000.

'f; The utility company agreed to reimburse DOE for the cost.

w" 2.

The manifolds were requested on the afternoon of April 17, 1979, 7'

and were shipped air freight, by 10:00 p.m. on April 17. 1979.

P-O, 3.

Personnel and organizational contacts were as follows:

n.E e

On April 17. 1979, R. L. Fergusort called R. P. Fasulo. (RL) and requestec tnat we provide fresn air breathing equipment to TMI.

J. L. Tcw was the DOE contact; he put us in direct contact with Joe Darrett of Metropolitan Edison Company.

ba,:

s The Metropolitan Edison Company's request was for standard MSA P

multiport breathing air supply manifolds.

p-Two manifolds were provided by Hanford Engineering Development e

?'

Laboratory (HEDL).

W. C. Cravens. Nuclear Facilities Adminis-trator, Chemical Engineering Cepartment, was the shipment W.

coordinator.

{U The manifolds were shipped to Metropolitan Edison company at TMI.

e

4..This activity was completed on April 17, 1979.

t.z Reactor Physics Calculations l!*

f 1.

Battelle's. Pacific Northwest Laboratory (PNL). under existing Re-

~

quest for Services agreement with NRC. perfomed physics calcu-lat'ons for NRC following the accident at THI.

Calculations were perfomed to estimate the amount of core blockage which had cccurrec, using temperature data provided'by NRC.

- h' 5-2.

The calculations were requested by Sol Levine. Director of the Office of Regulatory Research, NRC. through the home office of Battelle Memorial Institute. PNL contact was Dr. D. 5. Trent.

[ _'.

Manager of the Fluid and Thermal Engineering Section.

E r

M

'h 802 33'1 9

.s-

'i 4

~

il

-a h

2-I

.g

?

3 3.

Calculational results were provided to NRC at THI. NRC should I

2 be contacted for information on results.

L' 4.

Work has been completed, except for final documentation, which h

is currently being prepared for transmittal to NRC.