Notice of Deviation from Insp on 790514-17
ML19253A185
Person / Time
Issue date: 06/11/1979
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19253A177 List:
References
REF-QA-99900030 NUDOCS 7908200031
Download: ML19253A185 (1)


Text

.

Fyron Jackson Pump Division Docket No. 99900030/79-01

~

30TICE OF DEVIATION Bar-d on the results of an NRC inspection conducted on May 14-17, 1979, it appeared that certain of your activities were not conducted in full compliance with NRC requirements as indicated below:

Criterion V of Appendix B to 10 CFR 50 states in part that, " Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings,,

of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings.

In addition, weld procedure WP-1256, Revision 0, as referenced by route sheet No. 168487, specified that a shaft impeller be welded with a single J groove configuration at 24 to 28 volts.

Contrary to the above requirements, it was observed that welding of shaft impeller assembly identified in route sheet No. 168487 was:

(1) Being welded with a fillet weld.

(2) Being welded with 20 volts.