Text
[
"g,.
k7 MAY 4 1980 MEMORANDUM FOR: Countsrioner Peter A. Bradford FROM:
W'lliam J. Dircks
'cxecutive Director for Operations
SUBJECT:
FIRE PROTECTION RESEARCH BRIEFING Representatives fro : Sar,dia, Brookhaven Underwriters Laboratories Inc. (UL),
and the Johns Hopkins University Applied Physics Laboratory met on April 22 and 23 with staff members from NRR and RES to discuss both the NRR-requested confirmatory research projects on the 20-foot separation and 1-hour fire barrier criteria, and the Browns Ferry replication test.
1.
Discussion of 20-foot separatfoa criterion and the 1-hour fire barrier Sandia committed to submit to the NRC, by May 22, a draft test plan based on a preliminary test pien developed for NRR by Gage-Babcock and Associatiens, Inc., in August 1979 Following NRR/RES review of and comment on the draft test plan, Sandia should have a final test plan ready by June 22.
We will provide a firm estimate on schedule and costs after a final test plan has been agreed upon by Sandia, URR, and RES.
Sandia has detemined that adequate laboratory facilities and per-sonnel are available to begin work on the tests as soon as an acceptable test plan is developed.
2.
Discussion of NRR-requested modification of Browns Ferry replication, test You are correct that RES and NRR have agreed to modify the Prowns Ferry replication test so that it represents a configuration which wauld be acceptable under Appendix R.
Pe intend to do this and con-duct a third test in the sequence as discussed below.
This test plan originally provided for two test fires in a replication of a portion of the reactor building at Browns Ferry with all of the protective features installed during the post-fire reconstruction.
One test fire would be run with the automatic sprinkler fire suppression system operational. The second test fire would be run with the auto-jl#
matic sprinkler fire suppression system not operational to simulate the t
system being out of service or failing to operate.
Fire suppression
' O, would be dependent entirely on the # ire brigade response.
8106o80253 p/y 4_
sman>\\,
.4
-, " o* "cm" OFFICIAL RECORD COPY
" ~ " '
w,
.e g
p g-4 4
Comissioner Peter A. Bradford In order to also evaluate the 1-hour fire barrier criterion in Appendix R.
a third test will also be conducted similar to the second test with the automatic sprinkler fire suppression system not operational.
The staff balieves that this Browns Ferry test series should be completed, in consideraticn of the funds already committed and spent on the test materials and fabrication.
Also, as the two originally-planned tests are yet to be conducted, the third test can be conducted at only a nomi-nal additional cost.
The staff concludes, however, that the issuance of Appendix R may obviate the need for extensive demon:tration programs.
To this end NRR and RES staff have agreed to reevaluate the need for fur-ther tests (on specific geomebies representative of Rancho Seco Arkansas 1, and Brunswick) at the conclusion of these three Browns Terry tests.
(!! r.cd Vii 2 m L Dircks E
William J. Dircks
~
Executive 9frector for Operations cc: Chairman Hendrie Corrnissioner Gilinsky Commissioner Ahearne L. Bickwit D. K. Rathbun S. J. Chilk DISTRIBUTION:
Central File EDO 10409 RES Subj OEBassett Circ Dross Chro n RScroggins EEB r/f PTing DFSull iva n KCornell DPNotl ey TRehm RFeit HDenton LCShao MBridgers GAArlotto RLMinogue RHVollmer VBenaroya RLFerguson RDSilver WJDircks
, RES DFRoss
- SEE PREVIOUS RECORD COPY ' OR CONCURRENCES 5/ /81
[
EDO RESf p m,,apDET:EEB DET:EEB DET DET NRR DPNotil ey
- DHSullivan
- LCS ha o
- GAArl' otto
- RHVolimer RBMinojue MD'i m,,
rm >!5/1/81 5/
/R1 E/
/Cl i t/ /91 r/ /91 5/(./81 5/ / /81
..g..
uc,c w n.w m,#c u < m OFFICIAL RECORD COPY
"" *3x'
h Dis tribution:
Central File Dross RES Subj RScroggi.u Circ PTing Chron KCornell EEB r/f TRehm DFSullival HDenton Pi"atle MBridgers kFeit LCS) lotto o
G)Ac MEMORANDUM FOR: Commissioner Peter A. Bradford SSMinogue FROM:
William J. Dircks
/kHvo11mer VBenaroya Executive Director for Operations
,/ RLFerguson StBJECT:
FIRE PROTECTION RESEARCH BRIEFING
/
RDSiiver j/'
EDO 10409 GEBassett P.cpresentatives from Sandia, Brookhaven, Underwr ters Laboratories. Inc. (UL),
and the Johns Hopkins University Applied Physics Laboratory met on April 22 and 23 with staff members from NRR and RES to/ discuss both the NRR-requested confirmatory research projects on the 20-foot separation and 1-hour fire barrier criteria, and the Browns Ferry replication test.
1.
Discussion of 20-foot separation crite ion and the 1-hour fire barrier l
Sandia comitted to submit to the NRC, by May 22, a draft test plan based on a preliminary test plan dsveloped for NRR by 056Te-Babcock &
Associates, Inc., in August 1979/ Following NRP/RES revis of and comment on the draft test plan, Jandia should have a final test plan ready by June 22. ke will not pave a firm estimate on either schedule or costs until a final test pl n has been agreed upon by Sandia, NRR, and RES.
are available to begin war, Adequate laboratory facilities and personnel Sandia has determined that on the tests as soon as an acceptable test plan is developed.
2.
Discitssion of NRR-reque.sted modification of Browns Ferry replication test
/
You are correct' that,ES and NRR have agreed to rnodify the Browns Ferry replication test so hat it represents a configuration which would be acceptable under endix R.
William J. Dircks Executive Director for Operetions cc: Chairm Hendrie Comissioner Gilinsky RES }
Commissioner Ahearne Dross L. Bickwit f 4]'/ 1 D. K. Rathbun p[
.L.J._thilk
/
1
).
lay:sttf..D.F[d)an. ].LCS.han[
.Cf.
/J.
!.DET.:.Ep. ]. DEL o"M. PET:
RES E.DO.
.N.
E EB..
.ESIrlotto.
,4 mer.
. RBMi no gue.
].WJDircks.,
""* D
. _. 0.4/p/ 8).
.[04/,,,f81 04/ / 81,
.f. 044,f/.8).
. $ /
81 04/27/.81
.[.04/;L7/.S)..
n OFFICIAL REC'ORD COPY unc ronu asa nosoi sacu onc