Supplements Re Leaking Tubes in Steam Generators a & D.Eddy Current Testing of Row 1 Tubes in All Four Steam Generators Will Be Completed.All Leaks Will Be Plugged During Current Outage
ML19250C590
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 11/16/1979
From: Broehl D
PORTLAND GENERAL ELECTRIC CO.
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
NUDOCS 7911280418
Download: ML19250C590 (2)


Text

\\

bc: LER Distribution List

\\

L. Cunningham (W), C. Tra=mell, M. Axelrad, LIS, INP: GOV REL F:

1 NRC CHRONO, PGE TO IE i

e

~'

D,, -

Portland Genem! ElectricCcorgany

a: 5 ce,. Asscrn ce des ce" November 16, 1979 i

Trojan Nuclear Plant Docket 50-344 License h7F-1 Mr. R. H. Engelken, Director Nuclear Regulatory Commission Region V Suite 202, Walnut Creek Plaza 1990 N. California Blvd.

Walnut Creek, CA 94596

Dear Mr. Engelken:

Pursuant to discussions with the Nuclear Reactor Regulation Staff (Division of Operating Reactors), the following information supple-ments our letter of November 4, 1979 concerning leaking tubes in "A" and "D" steam generators at the Trojan Nuclear Plant. We will com-plete eddy current testing of row one tubes in all four steam gener-ators and plug all indications and/or id.entified leakers during this outage.

If at any time, prier to removing tube samples as committed below, the steam generator tube leakage exceeds 150 gpd, the Trojan Nuclear Plant will be shut down and the steae generator tubes inspected. Should the location of the leaks be determined to be in the same area as the leaks presently identified in steam generators "A" and "D", samples of tubes will be removed for further inspection and analysis prior to resumption of power..If the source of leakage is in locations other than near those presently identified, an evaluation will be made based on the particular circumstances. In any case, tube samples will be removed from steam generator "D" at the next refueling outage.

1406 308 n,,g /f

- w-z.-

s PortlandGeneralBectricCo vsif Mr. R. H. Engelken November 16, 1979 Page Two This approach will allow us to resume operation of the Trojan Nuclear Plant with no compromise in safety and no relaxation in the conserva-tisms developed in our Plant accident analyses. The interest of the public can best be served by the above course of action.

Sincerely, W

DJB/CAE/4sa4A22 c:

Mr. Lynn Frank, Director State of Oregon Department of Energy Mr. A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors U. S. Nuclear Regulatory Commission 4 n 309