C F_F,i~~'t17 p sJ l

f m

J111 * ' 1979 UNITED STATES OF A1IERICA

-e NUCLEAR REGULATORY COSI3IISSION:(..,n u n - +.

. O

- i..

BEFORE THE ATOAIIC SAFETY AND LICENSING EOARD In the AIatter of

)

)

PUGET SOUND POWER & LIGHT )

Docket Nos. 50-522 y\\=%

COAIPANY, et al.,

)

50-52 4

'4\\

}

Y cccx-a (Skagit Nuclear Power Project

)

6 Y

ustmc Units 1 and 2)

)

9

{cl JUN 2 91979 > E m

"ica :t.u sceurf L-e Order for Evidentiary Hearing G ccentng s senica 43 and Related 11aners 5 scca

?

S t j t o. t 1.

On AIarch 27, 1979, an order for a $ree-day cerlerence, on S

April 24, 25 and 26,1979, to schedule eviden:iary hearings and to take furder steps to.=ove along the prcceeding was issued. On April 10, 1979, an order of the agenda for the ccnference was issued.

2.

The conference itself teck place in Seanle, Washington on April 24, and the agenda for the ccnference having been handled in an e:cpediticus manner, the conference itself ended Se same day.

3.

At the ccnference, de following agreements were made by de parties and approved by Se Board, and they are hereby confirmed by de Beard:

TISIE AND PLACE OF EVIDENTLARY EEARING:

The evidentiary hearing shall resume at 9:30 a.m.,

Tuesday, July 17, 1979, at Room 3036, New Federal S

Building, 915 Second Avenue, Sea:tle, Washington, pro-vided that a trial scheduled for sir. Leed during ie seccnd half of June ends by June 29 (Tr.11,831).

' 3 ' ) () 2 9 t) 79112 10159 o

,hn. l. !..3

l

_f e

f*

'I' D '33

'W MS b 6

' D D

j,gl/gf.,

1.'

^'

,, a, duL d

',,.r

3.

m p j.,. '.. / / U,.../

r.

_o-a.

. T y,x.d, 1:....,.,-/. :

..u s

6

-I '

It is anticioated da: this session of the ~evidentiarv '

/

b pk -9 hearing will e entinue to and including Friday, August 3,

,d'.<,

1979, excluding weekends.

t ;'./'.

/<

//

/ /$,

PRE-FILING:

- / V, 9

.p

.k/,.

N. B.

The nomenclature of headings and the nu-

/

merical and alphabetical references to the headings are taken from the Board's Order of April 10, 1979. Page references to tran_ script are in parenthesis.

I.

ENVIRONMENTAL MATTERS i

A.

Environ = ental Imcac: Sta:ements 5/

,./s No further evidence (Tr.11,221).

i f-s-WM B.

Imoacts of Constructien

/

y.* <\\, f.t -

/

m Staff: Prefile by June 1 (Tr.11,921).

Ap,alicant, SCANP, FOB: Prefile tes timony re-spending to Staff, by July 10 (Tr.11,921).

C.

Imcac: cf Ocera:icns (1) Cooline Tower Coeraticn No evidence (Tr.11,924).

2',7 1

.r C.

Imract of Ocerations (2) Visual Incacts

/

e No evidence (Tr.11,924).

C.

Imcac: cf Ceera:icns (3) Proiec: Discharre

- 'l' No evidence but SCANP warns tha: it may file meticn to

/

i',

recpen aqua:ic impac:s (Tr.11,924).

f I

C.

Incact cf Ocerations (4) Rannev Ccilec:or System

_7V

./

p.

Staff: Prefile by June 1 (Tr. 11,924).

p g

% *s SCANP: Prefile by June 15 (Tr.11,925).

hd b

'(

,. / 7 U

n L=

s Anyone, particularly in respense to earlier filing:

Prefile by July 10 (Tr.11,925).

C.

Imcacts of Coerations (5) Radiological Releases 1

>C' No evidence centemplated. However, SCANP may
'

file a motion re Class 9 accident (Tr.11,925).

C.

Imcacts of Ceerations (6) Socio, Economic and Other This s.aject is transferred to H (Tr.11,925).

D.

Effects of Postula:ed Accident No evidence contemplated. Subject relates to SCANP's positicn on Class 9 accident (Tr.11,925).

E.

Alternative Sites Applicant, Staff, SCANP, FOB: Prefile by June 29 (Tr. 11,,92 5).

F.

Alternative Enerav Scurces Applicant, Staff, SCANP, FCE: Prefile by June 29 (Tr. 11, 92 S ).

p'h G.

Need for Power

/,

', ']U,

.f.'# W Pending SCANP's =cticn before Beard.

i. !

f

( *;

..t.

H.

Cost Benefit.2.nalvsis LOA $

p Staff: Prefile by June 29 (Tr.11,923).

['/fu% -f Applicant, SCANP, FOB: Prefile up to July 17 (Tr.

Q p./I.:'I 'N',. 11,928).

h,f. -27,cc I.

Federal Water Pollution Cen:rcl Ac:

No evidence. SCANPs pcsrible motica en aquatic effec:s S

'i

'),

is related :o subject (Tr.11,929).

f/

. s.'&

l,.'y.'-f, f' 4i 9 A'
'l', ' ;,,7

?rG W-

'// g/

3 zne o

s ~0 J

'h 'a '* *'-.

f,,r; -,

f l.. '.U."

, b,

t,%

4 1J ss'

?

  • 6

.,f A %Si",

' s. 'Ls,f,.'),

w

.A /

J.

Wild and Scenic Rivers Act No evidence (Tr.11,929).

II. SITE SUITABILITY A.

Geograchv and Demcerachv No further evidence (Tr.11,929).

B.

Nearbv Industrial, Militarv and Transoortation

'N

\\

Issue regarding evidence en military aviaticn left for SCANP and NRC staff :o rescive (Tr.11,929).

C.

Geolcev and Seismcicev Applicant: Prefile by June 1 (Tr.11,930).

~

A SCANP: SCANP will advise by June 1 when Dr.

ji Cheney :. vill complete his report (Tr.11,931).

Staff: Ecpefully targeting a September time frame (Tr. 11, 931).

D.

Suitability for Deve1coment of Evacuation Plan

\\

'n SCANP: Prefile by July 10 (Tr.11,933).

/~

III. RADIOLCGICAL HEALTH AND SAFETY A.

Site Criteria This relates to B. Gecloev and Seismc1cev under

'y' II. SITE SUITABILITY above (Tr.11,933).

B.

Financial Qualifica:icns Applicant: Prefile by June 1 (Tr.11,934).

Staff: Prefile by June 29 (Tr.11,934).

m

'3"6 301

A SCANP: Prefile by July 10 (Tr.11,936).

FOB: Prefile by June 29 (Tr.11,938).

C.

Others (1) Loose Parts Monitoring Applicant and Staff: Prefile by June 29 (Tr.11,938).

C.

Others (2) Quality Assurance Applicant: Prefile by June 29 (Tr.11,939).

Staff: Not certain whether there will be any testi=cny beyond the SER (Tr.11,941).

C.

Others (3) SCANP's Centention re Adequacy of Applican:'s Emergency Plan m

Applicant and Staff: Prefile by June 29 (Tr.11,942).

SCANP: Prefile by July 10 (Tr. 11,942).

DISCOVERY:

Initial discovery requests regarding any outstanding item which will be heard a: the hearing beginning July 17,1979 =ay not be made after June 1,1979, and supplemental discovery requests, that is, requests based on unsatisfactory respenses to any initial discovery reques, may not be made after ten days following receipt of the answer :o the initial discovery request which eccasioned the supplemental request (Tr.

11,945-11,949).

4.

The Board received a le::er from SCANP da:ed June 6,1979 stating that it objects to the Applicant's proposal :o introduce in:o evidence the "Bechtel Report" cn site geology 2: the scheduled July hear-ing on the basis that it had not yet been supplied " proprietary" exhibits to the report which it had requested. Since no answer to in:ervencr's iP6 302

8 statement has been received to date, it is assumed that applicant and intervenor have resolved de issue. If Sey have not, Se board re-quests dat they make every effort to settle the issue for$wi$, or otherwise to prese$1t promptly de matter in suitable detail :o the Board for a ruling.

5.

Since the April 25 ccnference, de Scard has received several requests for limited appearances. The Board has decided to permit limited appearances at the beginning of de hearing scheduled to start on July 17. Limited appearances requested of the Beard since the g

April 25 conference are hereby granted to the following:

  • Rcbert E. Skelly AIember of the Legislative Assembly Province cf British Columbia SIunicipal Council of Surrey British Colunibia by Alderman Ecb Jacob British Columbia SIedical Asscciation by Niel Petreman, AI.D.

President Vancouver, British Columbia Greenpeace (a non profit organicatien) by Red AIarining, Direc:cr Vanccuver, British Columbia "3Ir. Skelly's le::er cf June 15, 1979 requesting a limi:ed appearance s:a:ed: "1Iyself and cther IIembers cf Se ~_ egis-g lative Assembly would like to make a limi:ed appearance and statement at Se hearing. ", in his limited appeara.ce, sir.

Skelly is welecme to speak for himself and h:s cc11eagues and to submit a sta:ement in Seir behalf.

'36 303

m 6.

Perscas wishing to make a limited appearance at Se hearing scheduled to begin en July 17, 1979, are requested to give advance notifi-catica to ie Secretary, United States Nuclear Regulatory Commissien, Washington, D. C.

20555. Those planning to make a limited appearance at the hearing beginning en July 17 are directed to check wid me Beard's clerk at 9 A.TI Sat day at the hearing room.

7.

The Commissien's regulation at 10 CFR 5 2. 715(a), pertaining to limited.Lppearances, is pertinent:

"a A persen who is not a party me.y, in de dis-cretien of the presiding officer, be permitted to

=ake a limited appearance by making oral or written statement of his position on the issues at any session of the hearing or prehearing ecnference wi$in such limits and on such conditicns as may be fixed by the presiding officer, but he may not otherwise partici-pate in the prcceeding. "

8.

In keeping with Se understanding left the Scard at the April 25 ccnference, the parties will have agreed prior to the hearing upon Se sequence of treating varicus subjects at the hearing beginning July 17 and upon the order for calling witnesses. A summary statement cf such informatien will be made available to $e board members so Sat Sey will have it in hand during the week preceding July 17 (Tr.11,949-11,950).

9.

In de event.TIr. Leed's trial is act ended by June 29, ce parties shculd promptly actify de 3 card with deir recommendatiens for time to resume 6e evidentiary hearing.

1 3n6 304

A.-R Done this//

day of June,1979 at Washing cn, D. C.

ts ATO.',IIC SAFETY & LICENSING O EOARD

/

/

/_

/

By b hA t/A

(! /4 Valen:ine B. Deale, Chairman 170(

), I i i..U..,

J J

N M

-