Discusses EPICOR-II Readiness,As Requested by NRC 791016 Order.All Operating Procedures Have Been Submitted to NRC & Comments incorporated.EPICOR-II Sys Is Designed & Constructed in Accordance W/Reg Guides
ML19250A516
Person / Time
Site: Crane Constellation icon.png
Issue date: 10/18/1979
From: Herbein J
Metropolitan Edison Co
To: Harold Denton
Office of Nuclear Reactor Regulation
References
GQL-1324, NUDOCS 7910230558
Download: ML19250A516 (1)


Text

Metropoh an Edison Company gj 0

Post Office Box 1909 York, Pennsylvania 17405 717 846-7800 October 18, 1979 GQL 132h Director of Nuclear Regulation Attn: Harold Denton U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

Three Mile Island :Tuclear Station, Unit 2 (DE-2)

License No. DPR-73 Docket io. 50-320 EPICOR II Readiness As requested by the NRC Crder of Cetoter lo,1979, this letter is being submitted prior to operation of the EPICCR II System, to address the readiness of the system in processing intermediate level vaste water from DE-2.

Currently, all procedures required for the operation of EPICOR II have teen submitted to the NRC, and their comments have been incorporated into these procedures.

In addition, the EPICCR II N tem has been designed and constructed in accordance with NRC Regulatory Guides addressed in the NRC Environmental Assessment "Use of EPICCR II at SE-2" of August lb, 1979, Section 3.6.

Finally, suitable tankage at SII-l shall te maintained to store vaste water from DE-2 should additional storage capacity become necessary.

gineerely,.

x

,v

~-_

s'

/$'

J. G. Hertein

,/

Vice President-Nuclear Cperations

,/ /