ML19250A496

From kanterella
Jump to navigation Jump to search
Forwards LER 79-066/03X-1
Date released: 09/21/2019 Download: ML19250A496


LER 79-066/03X-1:on 790907,while Conducting Operations Surveillance Test,Average Power Range Monitor Channels A,D & F Tripped 0.5% Over Tech Spec Requirements.Caused by Operator Error.No Drift of Instrument Setpoint Occurred
ML19250A500
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/19/1979
From: W. Verne Childs
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19250A500 (2)
Forwards LER 79-066/03X-1
ML19250A495
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/19/1979
From: Leonard J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19250A495 (1)