ML19250A457

From kanterella
Jump to navigation Jump to search
Forwards LER 79-040/01T-0
Date released: 09/21/2019 Download: ML19250A457


LER 79-040/01T-0:on 791011,wrong Valves Installed in Piping Sys.Caused by Deficiency in Original Plant Design Equipment Specs.Valves Being Replaced
ML19250A458
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/19/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19250A458 (1)
Forwards LER 79-040/01T-0
ML19250A456
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/19/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19250A456 (1)