ML19249E899
| ML19249E899 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 08/29/1979 |
| From: | Lainas G Office of Nuclear Reactor Regulation |
| To: | Ippolito T Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19249E900 | List: |
| References | |
| NUDOCS 7910020681 | |
| Download: ML19249E899 (1) | |
Text
,
-', ') u s
,il I
,,LL
'a ma arco
,o, UNITED STATES
+
i NUCLEAR REGULATORY COMMISSION
,e g
E WASHINGTON D. C. 20655 8
AUG 2 91979
%,.....f 1
MEMORANDUM FOR:
T. Ippolito, Chief, Operating Reactors Branch #3, DOR FROM:
G.'Lainas, Chief, Plant Systems Branch, D0R
SUBJECT:
HATCH 1 - RPS POWER SUPPLIES (TAC 07768)
PSB has completed its review of the licensee's proposal to install an electric power mcaitoring system on the output of each RPS power supply.
As stated in the enclosed Safety Evaluation Report, we find this modification and the associated Technical Specifications acceptable, provided that all time delays are set to zero.
W G. La a, Chie Plant ' tems Branch Division of Operating Reactors
Enclosure:
As stated
Contact:
J.T. Beard X-28077 cc w/ enclosure:
D. Eisenhut B. Grimes W. Gamill G. Lainas D. Tondi D. Verre11i J.T. Beard (2)
PSB, Section A P. Shemanski V. Panciera 1070 254 7910020 h/ g