ML19249E899

From kanterella
Jump to navigation Jump to search
Forwards Safety Evaluation Re Licensee Proposal to Install Electric Power Monitoring Sys on Output of Each Reactor Protection Sys Power Supply.Mods & Tech Specs Acceptable, Provided Time Delays Set to Zero
ML19249E899
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/29/1979
From: Lainas G
Office of Nuclear Reactor Regulation
To: Ippolito T
Office of Nuclear Reactor Regulation
Shared Package
ML19249E900 List:
References
NUDOCS 7910020681
Download: ML19249E899 (1)


Text

,

-', ') u s

,il I

,,LL

'a ma arco

,o, UNITED STATES

+

i NUCLEAR REGULATORY COMMISSION

,e g

E WASHINGTON D. C. 20655 8

AUG 2 91979

%,.....f 1

MEMORANDUM FOR:

T. Ippolito, Chief, Operating Reactors Branch #3, DOR FROM:

G.'Lainas, Chief, Plant Systems Branch, D0R

SUBJECT:

HATCH 1 - RPS POWER SUPPLIES (TAC 07768)

PSB has completed its review of the licensee's proposal to install an electric power mcaitoring system on the output of each RPS power supply.

As stated in the enclosed Safety Evaluation Report, we find this modification and the associated Technical Specifications acceptable, provided that all time delays are set to zero.

W G. La a, Chie Plant ' tems Branch Division of Operating Reactors

Enclosure:

As stated

Contact:

J.T. Beard X-28077 cc w/ enclosure:

D. Eisenhut B. Grimes W. Gamill G. Lainas D. Tondi D. Verre11i J.T. Beard (2)

PSB, Section A P. Shemanski V. Panciera 1070 254 7910020 h/ g