ML19249E666

From kanterella
Jump to navigation Jump to search
Forwards Addl Info in Response to IE Bulletin 79-14.Provides Results of Insp as of 790825.Total of 350 Discrepancies Have Been Found Between Design Documents & Actual Seismically Designed Piping Sys Configurations
ML19249E666
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/07/1979
From: Fox C
WISCONSIN ELECTRIC POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 7910020128
Download: ML19249E666 (38)


Text