Notifies That OL Review May Begin of Sections Re Conduct of Operations,Initial Test Program & QA Program of Draft Fsar. Review of QA Topical Rept MPL-TOP-1 Is Continuing.Questions Arising from Review Encl
ML19249E527
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 05/23/1978
From: Heltemes C
Office of Nuclear Reactor Regulation
To: Stolz J
Office of Nuclear Reactor Regulation
References
NUDOCS 7910010634
Download: ML19249E527 (2)


Text

.U o e w e r a u -

r i o DISJRIBUTION:

' DEcket'~fIlis (2)

QAB Projects yM 2 31973 CJHel temes, Chron. File DJSkovholt, DP!4 l

l RCDeYoung, DPii JConway, QAB F

Docket !!os.:

5 416 FAllenspach, QAB l{

r 50 4f7 JGilray, QAB j

RMcDermott, QAB

!!EliOPlulDU'i FOR:

J. F. Stolz, Chief, Light Uater Reactors Cranch !!o.1.

Division of Project Managercent l

FR0!1:

C. J. !!elttaes, Jr., Chief, Quality Assurance Branch, Division of Project Managenant

SUBJECT:

ACCEPTANCE REVIBl:

Grid;D GULF !!UCLEla STATION UNIT NOS.1 & 2 - QUALITY ASSURA!;CE, C0hDUCT OF OPEPATIONS, IMITIAL TEST PROGRA!!

Applicant: Mississippi Power and Light Ccnpany (MP&L)

Licensing Stage:

OL Responsible Cranch: LUR #1 Project Manager:

C. Thonas Repasted Conpletion Date: May 22, 1978 Revieu Status: l'.cceptance Review Complete The Quality Assurance Cranch has revicued the FSAR sections describing the Conduct of Operations (Sections 13.1 and 13.4), Initial Test Program (Chapter 14), and the quality Assurance Prograa (Section 17.2) submitted in support of the Operating License application for Grand Gulf.

The QA progran for the operations phase of Grand Gulf is described in tha M

.i o i

<!, Q L-TCP-1 M id I '

.y 1970.

his rc;;rt is curr a lly ceiag ru.'ic..~.1 by the Q.',D.

The results of our acceptance revic'.4 indicate that adequate infornation has been s"bnitted by 1; PAL to initiate an OL review in these arcas.

Questions w,ich surfaced during our review are enclosed for transmittal to the applicant. These questions should not preclude docketing.

Orgnal Qud bf:

J. W. Giiray 3

0;unJ g  %.

C. J. "altems, Jr., Chief i

Ouality Assurance Granch j

r Division of Project !*magaent

Enclosure:

/cceptance Review Questions 773420298

\\,r,

~

N X

/

[ DJM:j)SEs DP ;QiB DPM:QAB, DPM: RAS,;j DFM:QAB AB 6,,..c m JC aylgt FAlle[pb JGilray i;J4cC$r b

'C fel t

.o.~..,w

,J.--..

5/.N/78 5/g/78 ' ~ ' - - - -

5 7 8_ _

5#6/78 5///c/ 78 i

me, r --

NRC IOR31 313 (946) NECM M40 U u. s. n ov t w u t ~ r P *.s rm s o r r ic ri t o 7 e - e r e.a ra 7 910 010 h04

GRAf10 GULF fluCI. EAR STATI0il UNIIS 1 T i 422.0 Conduct of Operations 422.1 You indicate in subsection 13.1.2.1 that "The functional positions (13.1. 2.1 )

in Figure 13.1-2 will be filled by the time of initial fuel loading of Unit 1."

Please revise Figure 13.1-2 (or provide the additional information by other means) to show the number of persons to be assigned to these functional positions by the time of initial fuel loading of Unit 2.

t 422.2 It is not possible to draw a clear comparison between several of i

(13.1.3) your plant staff positions and the functional positions described I

in ANSI N18.1.

Therefore, please provide a list of your plant staff positions vs. the corresponding positions identified in Section 4 of ANSI N18.1 or describe in detail your proposed qualifications for each position.