Mod 3,adding Funds & Extending Period of Performance,To Seismological Study of Northern Extent of New Madrid Seismic Zone. Contractor:St Louis Univ
ML19249E377
Person / Time
Issue date: 07/01/1979
From: Morton K
NRC OFFICE OF ADMINISTRATION (ADM), ST. LOUIS UNIV., ST. LOUIS, MO
To:
Shared Package
ML19249E376 List:
References
CON-FIN-B-5964, CON-NRC-04-76-282, CON-NRC-4-76-282 NUDOCS 7910010272
Download: ML19249E377 (11)


Text

-

Modificatien No. 3 Supplemental Aar:. ent to Contract No. NRC-Ca-76-282 SUPPLEMENTAL AGREEMENT BETWEEN SAINT LOUIS UNIVERSITY AND inE U. S. NUCLEAR REGULATORY COMMISSION THIS SUPPLEMENTAL AGREEMENT, effective the 1st day of July

, 1979, by and between the UNITED STATES OF AMERICA (hereinafter referred to as the

" Government"), as represented by the UNITED STATES NUCLEAR REGULATORY COMMIS-SION (hereinafter referred to as the " Commission"), and SAINT LOUIS UNIVERSITY

~

(hereinafter referred to as the " Contractor"),

WITNESSETH 1 BAT:

WHEREAS, the parties desire to modify Contract No. NRC-04-76-282 as hereinafter provided, and this supplemental agreement is authorized by law, including the Energy Reorganization Act of 1974, cs amended, and the Atcmic Energy Act of 1954, as amended.

NOW, THEREFORE, said contract is hereby modified as follows:

1.

Appendix A, attached to this supplemental agreement and made a part hereof, provides for the research to be performed by the Contractor during the contract period specified therein.

2.

In Article II - The Period of Performance, the date " June 30, 1980 is substituted for the date " June 30, 1979 3.

In Article III - Consideration, the sum "$271,573.00" is substituted for the sum "$193,573.00".

e 45

.4 IUb 79/00IO W%

.m-

": c,'ic Lic,a *;a. 3 Suppiccer,tal /grecm:,: :o Contract flo. tiRC-0.4-76-282 Page t;o. 2 Iti WITt:ESS WHEREOF, the parties have executed this document.

UtilTED STATES OF MERICA p

BY:

N N

Kellogg V4jttorton, Chief Researth C6ntracts Branch (title)

~

fluclear Regulatory Commission SAIt4T LOUIS UtlIVERSITY d

<a BY:

/

University Research Administrator (title)

I, Jerome J. Marchetti, S.J.

, certify that I am the (attester) of the Contractor named Secretary - Treasurer 4tiUe) undcr this document; that William Stauder, S.J.

(signatory) who sig"ed this document on behalf of said Contractor was then of said Contractor; that University Research Administrator this document was duly signed for and on behalf of said Contractor by authority of its governing body and is within the scope of its legal powers.

Iti WITtJESS WHEREOF, I have hereunto affixed my hand and the seal of said Contractor.

e d'

y

  • :/ / l s (i $ *

/

  • e s -

/

/

e (SEAL)

, 5 e

lv JJ V/D

ocificaricr. N:. 3 Supplemental Agreement to Contract No. NRC-04-76-242 CCNTRACTCR:

SAINT LOUIS UNIVERSITY APPENDIX A

~

For the Contract period July 1, 1979 through June 30, 1980 Article A-I RESEARCH TO BE PERFCRMED BY CONTRACTOR (a) The unclassifed scope of work under this contract entitled, "A Seismological Study of the Northern Extent of the New Madrid Seismic Zone," is as follows:

1.

Operate and mainta.'n an 8 station retwork.

2.

Interface network operation and correlate seismic data with operation of, and data from the seismic subnetworks comprising the New Madrid Seismic Zone monitoring system.

1 3.

Analysis of seismograms and location of earth quakes making use of the USGS array analysis system.

4.

?ublication of the quarterly, " Central Mississippi Valley Earthquake Bulletin.

(b) The Principal Investigacor expects to devote the following approximate amount (s) of time to the c:ntract work:

Robert B. Herrmann:

100% of his time for 1 academic month and 100% of his time for 1 summer month ARTICLE A-II WAYS AND MEANS OF PERFCRMANCE (a)

Items for which support will be provided as indicated in A-III, below (1) Salaries and Wages S 44,300.00 (2)

Equipment to be purchased or fabricated by the Contractor 3,723.00 i

%.e 4 R / **

9 f

'.e

-e-w e-e e *

,eeew-wee-mw+-.-m e

lm n uc.ic.n ;;o. 3 Supeier.::.tci Igrecu n: to

~

Contract No. NRC-04-76-282 Page 2 In Excess of 51,000.00 Computer Terminal Upper / Lower Case ASC II Terminal such as Teletype 43 Accelerograph Kinemetrics SMA-1 (kg)

Under $1,000.00 Spare Film Magazine i

Spare Roll 70 m Film (2 ea.) at $18 i

Spare 6 volt rechargeable batteries Spare trickle charger (110 VAC/12 UDC)

WWVB Receiver (internal)

WWVB Antenna (3) Travel(i)

Ocmestic 3

2,000.00 (ii)

Foreign S (4) Other direct costs including fringe benefits (5)

Indirect costs based on a predetermined rate of 68 percent applicable to salaries and wages.

(b)

Items, if any, significant to the performance of this centract, but excluded from ccmoutation of Support Cost and from consideration in proportioning costs:

NONE (c) Time or effort of Principal Investigator (s) including indirect costs and fringe benefits contributed by Contractor but excluded frcm ccm-putation of Support Ccst and from consideration in prcportioning costs:

NONE l

lvJ)

U/-

w

--me+e em-.-

w.--w---.sw m,.,-

m.

-voi fic8 tion ik. 3

ci
r. ental -grecrent to Contract tio. IIRC-04-76-232 Page 3

+

Article A-III The total estimated cost of items under A-II(a) above for the contract period stated in this Appendix A is $78,000:00

the Commission will pay 100 percent of the actual costs of these items incurred during the contract period stated in this Appendix A, subject 1.o the provisions of Article III and Article B-XXVIII.

The estimated flRC Support Cost for the contract period stated in this Appendix A is S 78,000.00 The estimated NRC Support Cast is funded as follows:

(a)

Estimated unexpanded balance from prior period (s)

S 0-(b) New funds for the current period S

78,000.00 (c) The new funds being added in A-III(b) constitute the basis for advance payments provided unde

  • Article B-X.

O 6

F 1

e se=e b

e i L?)