Forwards Request for Addl Info to Complete Review of QA Program
ML19249D986
Person / Time
Site: 07100197
Issue date: 09/07/1979
From: Macdonald C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Lamastra A
BETHLEHEM STEEL CORP.
References
NUDOCS 7909250638
Download: ML19249D986 (2)


Text

,

-[# **'4 UNITED STATES

[g

^n NUCLEAR REGULATORY COMMISSION 3lll[Hg(o}/

g VVASHING TON, D. C. 20555 15 o

SEP 0 71979

....+

FCTC:RH0 71-0197 Bethlehem Steel Corporation ATTN: Mr. Anthony Lamastra Bethlehem, PA 18016 Gen tlemen:

This refers to your application dated October 5,1978 requesting approval of your Quality Assurance (QA) program as meeting the QA program require-ments of 10 CFR 971.51.

In connection with our review, we need the information identified in the enclosure to this letter.

Please submit seven copies of your response to the enclosed request for additional information within 30 days following receipt of this letter.

If you have any questions regarding this request, please contact Mr. Jack Spraul at (301) 492-7741. This letter supersedes our letter of August 3, 1979.

Sincerely, b

Charles E. MacDonald, Chief s

Transportation Certification Branch Division of Fuel Cycle and Material Safety, NMSS

Enclosure:

Request for Additional Infonnation 1020 219

@909250 6 3 8

BETHLEHEM STEEL CORPORATION (71-0197)

Request for Additional Information 1.

Add a statement that the final responsibility for the quality assurance program for 10 CFR Part 71 requirements rests with the Bethlehem Steel Corporation, that this program will emphasize control of characteristics which are critical to safety, and that it will ensure that the quality control procedures, engineering procedures, and specific provisions of the package design approval are satisfied.

2.

Provide an organization chart (or charts) which shows the reporting relationships of the Corporate Radiation Control Engineer, Environmental Health Engineers, Radiation Coordinators, Radiographer-in-Charge, and Radiography Personnel.

3.

Provide a statement that management approved written procedures:

a) require training before executing quality assurance functions, b) control all documents related to a specific shipping package, and c) control document changes.

Also provide a statement that someone (indicate who by position title) insures that all quality assurance functions are performed according to the applicable version of these procedures.

4.

In the area of audits, add a statement that written check lists will be used, that each activity (including the activities of the Corporate Radiation Control Engineer) will be audited at least once every year that the activity takes place (rather than once every two years provided a Type B shipment has been made during that period), and that the auditor of the Corporate Radiation Control Engineer shall have no responsibility in the activities being audited.

1020 220

.-