ML19249D558
| ML19249D558 | |
| Person / Time | |
|---|---|
| Site: | 07000036 |
| Issue date: | 09/13/1979 |
| From: | Hind J, Holody D, Patterson J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML19249D557 | List: |
| References | |
| 70-0036-79-07, 70-36-79-7, NUDOCS 7909240833 | |
| Download: ML19249D558 (1) | |
Text
-
U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION III Report No. 70-36/79-07 Docket No. 70-36 License No. SNM-33 Safeguards Group III Licensee: Combustion 3ngineering, Inc.
P.O. Box.*.00 Windsor, CT 06095 Facility Name: Hematite Fuel Fabrication Plant Iaspection At: Route 21-A, Hematite, Missouri Inspection Conducted: August 1-3, 1979 Date of Last Material Control and Accounting Inspection: June 25-29, 1979 Type of Inspection: Unannounced Material Control and Accounting de M44 9/ M7f Inspectors:
. P. Patterson Chemist (Date)
V/l} lY no Statistician, Region I (Date) 9!/ 79 Approved By:
.A ind, hief Safeguards Branch (Date)
Inspection Summary:
Areas Inspected: Measurement Control Program.
The inspection involved 40 inspection-hours onsite by two NRC inspectors and was begun during the regular hours.
Results: No items of noncompliance were identified in the one area examined.
7909240 033
_