ML19249D368

From kanterella
Jump to navigation Jump to search
Summary of 790815 Meeting W/Util in Lynchburg,Va Re Mockup Demonstration for TMI Containment Bldg Remote Access & Surveillance Procedure R-626 by B&W
ML19249D368
Person / Time
Site: Crane 
Issue date: 08/22/1979
From: Jun Lee
NRC - TMI-2 OPERATIONS/SUPPORT TASK FORCE
To: Jay Collins
NRC - TMI-2 OPERATIONS/SUPPORT TASK FORCE
References
NUDOCS 7909240396
Download: ML19249D368 (1)


Text

Distribution:

<Clocket File (50-52p 9g D

D SEP R/F, 542 d b c, j PSS R/F, P-433 TMI R/F

}

~

JLee

. pt l

[

August 22, 1979 NRC PDR

_.]

kcal PDR v

Dockat No. 50-320 ME1:DEANDCI FOR:

J. T. Collins Deputy Director, TXI-2 Support FE03:

J. I Lee, T fI-2 Support SU3 JECT:

S&W HOCI:UF DEMONSTEATION FOR THZ TMI-2 CO:TIA.mfEHT BUILDING XL90TZ ACCZSS AND SURYvTT.Y2WCE PROCEAM (R-626)

On August 15, 1979, I attanded a meeting with Mika Morrell of GPU to witness a mockup demonstration for the THI-2 cone =innant building renoto access and i

surveillance procedura (1-626) by Z&W at Lynchburg, VA.

A spara penatration R-626 at 358' 6" clavation will be bored (9" diamatar) using the sama boring operation utilised for containment building vatar sampling procedura (4" dinastar). Following the completion of the boring operation, the cou mineent building romote surveillance will be accomplished r

l by (1) insarting TV camera for a v4===1 scan of tha area. (2) hsarting radiation surf.itlanca monitora to evaluata/S and Y fields, (3) obtaining air l

samples of the cournin=ent atmosphara, (4) obe=4 ing samples of horizontal and vertical surface contamination using swiping techniques, and (5) insarcing l

radiation survey equipment anshrouded with samples of radiation protective l

clothing for naasurements of shfalding effectiveness.

i The intended mockup test by B&W was limited to the aquipment demonstrations i

and procedural briefings and they did not perform a complete step by step procedurni mocxup test. Tha final rafinaments of design on the swiping devices, insertion and insr=11mtion of the permanent radiation monitor, and contain==nt humidity measurement davices are yet to be cosaplated. Also, abnormal operating proceduras and safety analysis on the failure to withdaav i

tools and aquipment, failure to naintain pressure boundary in the glove box.

^

and damage to the giova box giovas are yet to be performed.

I, beliava, therefore, a completa mockup and step by step procedural demonstration on boring operating, mounting of a giova box assembly between penetration R-626 and fuel hanatiar building penatration R-1551, and surveillance procaduras abould be performed at the THI-2 sita prior to aHng the actual penetration.

t Is/

Jay T. Las TMI-2 Support

ces H. Denton E. Vollmar 1002 065 i

. veuer I

R. Raymond, IE

a. crocker, I TMI-2 support 7909240 3 7 /

O j

JYLee:cj j

03/22/79