ML19249D356
| ML19249D356 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 08/09/1979 |
| From: | Chiramal M Office of Nuclear Reactor Regulation |
| To: | Vollmer R Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7909240344 | |
| Download: ML19249D356 (1) | |
Text
.
' h* [
q9
.AUG 9 1979
- 1. -
E
~
NOTE TO:
.R. Vollmer, Assistant Director *:,r Systematic Evaluation Program, Division of Operating. Reactors 111RU; G. Lainas, Chief,, Plant Systems Branch, Divis_ ion of Operating
~
Reactors.
FROM:
M. Chiramal, Plant Systems Brarch, Divisfon of Operating
~
' Reactors
SUBJECT:
COMMEliT ON ELECTRICAL EQUIPMENT INSIDE CONTAINMENT OF THI-2
REFERENCE:
Equipment List attached to GPU Letter dated July 19, 1979 s
I Any equipment that may be rendered inoperable by flooding should be traced l
to its electrical power source (an instrument power supply bus, distribution panel, motor control center or switchgear). At the first sigg of a malfunction I
attributable to flooding, the equipment should be electrically isolated at l
the power source so as toJrevent propagation of failure to other equipment
- connected to the sar'.a source..
1 M. Chiramal, I
Plant Systems, Branch i
Division of Op2 rating Reactors l
cc:
G. Lainas j
D. Tondi t
J. T. Beadd
~
r M.- Chi ramal LLOCAL.PDR h --:.a. %,% tr.p p43
- s. =. TMMY ' N~ h C
?.:
\\
N" ^
1002 041 D0.a;.e.se..L. 00.a;.s.t..e.SB_..
.DkW;;1.P.SE.,
MChiramal LL DTondi @
G if? ras
. 81..S..H9..
. Bl..S./7.9..
8/h.. U9........ l
-r.
- rec romu sis <p.763 xxoc o24e
- o.......1-.-,..-e....c=.....-...-...
T Y UN*" 3N
.