/.f uag'#o UNITED STATES l
NUCLEAR REGULATORY COMMISSION g
3
.g WASmNGTON, D. C. 20555 o
s., -*..../
August 16, 1979 MEMORANDUM FOR: Edward L. Jordan, Assistant Director, Livision of Reactor Operations Inspection, I&E G. Wayne Reinmuth, Assistant Director, Division of Reactor Construction Inspection, I&E FROM:
Steven A. Varga, Acting Assistant Director for Light Water Reactors, Division of Project Management
SUBJECT:
CRACKING IN FEEDWATER PIPING SYSTEM IE Bulletin No. 79-13 was recently sent to licensed epantinn facilities requesting that they perform certain examinations of the fcedwater piping systems at Westinghou:e and Combustion Engineering designed pressurized water facilities. This bulletin was also sent to applicants with plants still in the licensing review stage for information only.
However, no specific inspection requirements were stipulated.
As we discussed in our meeting, it is our understanding that you concur that the Westinghouse and Combustion Engineering designed PWR's which are still in the licensing review stage, should be required to perform an inspection of the above cited piping and report these results to you before the issuance of an operating license in accordance with the guidelines delineated in the bulletin, and that you are already moving in that direction.
Also as discussed, the enclosed priority list should be used in your activities.
Our need dates are also reflected on the list.
Please let me know if there are any problems with our schedules i\\
Qk t._
bven A.7arga, p ing Assistant Director for Light Water Re tors Division of Project Management
Enclosure:
As stated 752132 7909200 6 [
/
ENCLOSURE 1 NEAR TERM OL 'S
~
Salem 2 September 1979 r
f
\\
North Anna 2 September 1979 g
h Diablo Canyon October 1979 h
Sequoyah 1 October 1979 Y
McGuire 1 November 1979 Zinner November 1979 NEAR TERM CP'S Perkins 1-3 As Required Pebble Springs 1 & 2 As Required Skagit 1 & 2 As Required Pilgrim 2 As Required Allens Creek 1 As Required Black Fox 1 & 2 As Required FNP As Required 2'10 WAVE OL'.S LaSalle 1 January 1980 (1)
Shoreham February 1980 (1)
San Onofre March 1980 (1)
Surrer March 1980 (1)
Susquenanna Octooer 1980 (2)
Fermi 2
'lovember 1980 (1)
Watts Bar December 1950 (1)
WPPSS 2 March 1981 (2)
(1) Status - Issues Identified (2) Status l's Issued The above dates are final staff action criar to hearing or OL issue.
751.L93
i ENCLOSURE 1 (Continued)
D.
3RD WAVE OL'S AND CP'S Haven 1 CP October 1980 Grand Gulf OL March 1981 Farley 2 OL June 1981 Waterford 3 OL September 1981 Byron /Braidwood OL September 1981 New Haven 1 & 2 CP July 1981 Midland 1 & 2 01.
November 1981*
Comanche Peak 1 & 2 OL November 1981 Bellefonte 1 & 2 OL March 1982 Catawba 1 & 2 OL September 1982 South Texas 1 & 2 OL October 1982 Erie 1 & 2 CP Not Scheduled Davis Besse 2 & 3 CP Not Scheduled Greenwood 2 & 3 CP Not Scheduled
- Item. A an.!,ist_of 155ues requiring staff effort.be"and current.
active cases. Requires resolution in advance n' i eview schedule.
The above dates are CP or OL issue dates.
9
.A.
-