ML19249C489

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp of Licenses 21-0474-01 & SNM-1632 on 790521.Corrective Actions:Daily Response & Constancy Checks of Performance of Dose Calibrator Have Been Started
ML19249C489
Person / Time
Site: 07002258
Issue date: 07/02/1979
From: Ohlmacher J
FLINT OSTEOPATHIC HOSP., FLINT, MI
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19249C483 List:
References
NUDOCS 7909120294
Download: ML19249C489 (2)


Text

~

e-4^6.ce yWpg

'. ' r

% "AdaAg W -(tM d' -W R

In USBOOOllC OSOFO m f

. ~o.aern coa,oaar.o, mi v, am, ri u%,

m,,.,,, m.

~-

A.B. Davis, Chief Fuel. Facility, and Materials Safety Branch U.S.N.R.C.

799 Roosevelt Road W. DALE FERGUSON Glen Ellyn, Illinois 60137 President

Dear Sir:

BOARD OF TRUSTEES This is our response to your letter of June 12 1979, which listed apparent nonCompliant activities as noted by Mr. Richard L Hague HOWARD A CKOK Granscen-Ha, during his May 21 1979, inspecti u of our facility.

Please refer to Appendix A of your letter for the following references.

Vice Chairman GALE R. POTTER Item 1:

On May 31 1979, we held a meeting of the Medical cnevroie: cotor Division. Retwed Isotopes comittee.

One topic of discussion was the required meeting frequency. Notices of quarterly meetings will be JUDGE H R L H. BOBIER Item 2:

Daily response and constancy checks of the perfomance have ordered another Cobalt-57 source of the same geometry and W. DA E BA HTEL Ac Spark Plug. Retired construction as the one currently in use. This will afford two DR MYRTLE BLACK Teference point of approximately 0.6 and 5.0 millicuries.

Result Mott Foundation. Retired of these checks are being logged.

GER ALD E. PIESKO. D O.

Item 3:

Our " Cutie Pie" type survey meter, Texas Nuclear

" '*c8' S '* "

Models 2593, 2594 and 2595 were sent to the manufacturer for preventative maintenance and Calibration on May 22 1979. The units were received yesterday, June 27 1979.

(See attached.)

JOHN S. STOUT Buica uotor Division Item 4:

A procedure for facility shutdown at shift end is GERALD J. WINTER being developed. Within this procedure is the requirement Chevrolet Fhnt Assembly for site and waste surveys, and recording of their results.

We gypect to jmp]Ement this within 30 days or less.

PAULA. MURPHY General Motors Parts Division Item 5:

Notification of the location of 10 CFr parts 19 and 20 was added to the revised copy of NRC-3 supplied by EDWIN E. LUKE A G. Edwards & Sons. INC.

Mr. Hague, and was duly posted on May 22 1979.

JAMES A. HAYES Please feel free to contact me should there be any questions.

compete Design service MRS MARGARET G. STEWART Reii,ed. ueeropontan Director Sincerely, Girl Scouts ttGreater N.Y.

k?D 70091bo 2C/4 LEO SEIDE Auto Cety Distributors. INC Joseph P. Ohlmacher

.gMlh.Q GERALD T. MEIER Health Physicist Ac soarm Piug ENC.

cc: Dr. Monsour

.WMl%g J(J,yyJ Dr. Stratton M2 1s 79 J0:ps m

-.y

~

- y,,t );-N' Texas Nuclear 8

Division Ramsey Engineenng Company Box 9267 Aushn Temas 78766 usa Telephone (512) 836-o801 Teles 774413 CERTIFICATE OF INSTRUMENT CALIBRATION This is to certity that the product described below was calibrated on the date shown below by a qualified Service Technician of the Texas Nuclear Division.

MODEL NO:

2 4 74Z SERIAL NO:

7//

CALIBRATION DATA:

Calibrated & checked on all ranges against a calibrated 60 mci kr-8:i source. All ranges agree +101.

.DATE:

[-2 7-29

, NEXT DUE:

G

,2a - fd SIGNATURE:

MM us/,

This is our certification to you that your product was calibrated within three (3) days priur to its shipment.

TEXAS NUCLEAR DIVISION bERVICEDIVISION I..

W.