ML19249B476

From kanterella
Jump to navigation Jump to search
Forwards LER 79-018/03L-0
Date released: 09/20/2019 Download: ML19249B476


LER 79-018/03L-0:on 790802,during Power Increase After Maint Power Reduction,Max Critical Power Rating Was Below Tech Spec Min.Caused by power-increasing Xenon Transient.Control Rods Inserted & Core Flow Increased for Continued Operation
ML19249B490
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 08/30/1979
From: Conway W
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19249B490 (2)
Forwards LER 79-018/03L-0
ML19249B474
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 08/30/1979
From: Conway W
VERMONT YANKEE NUCLEAR POWER CORP.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19249B474 (1)