Text
7~/ L--
- p* ** cm'o, UNITED ST ATES
'n NUCLEAR REGULATORY COMMISSION 8'
e REGION il 101 MARIETT A ST., N W., SUITE 3100 o,
[
AT L ANT A. GEORGI A 30303
%g
'\\.
g In Reply Refer To:
AUG 141979 RII:JP0 50-437 Offshore Power Systems ATTN:
A. P. Zechella, President P. O. Box 8000 Jacksonville, FL 32211 Gentlemen:
With this Information Notice the Nuclear Regulatory Conmission is extending an existing mechanism previously used for informing facility licensees of signifi-cant operating events to include informing operator licensees of significant It is requested events which could impact on conditions of their NRC licenses.
the facility licensee provide copies of this Information Notice to all NRC t hat this licensed individuals at the facility.
No specific response is requested at the Director of If you have questions regarding this matter please contact time.
the appropriate NRC Regional Office.
Sincerely, g9.O'9ad
'ames P. O'Reilly rector
Enclosures:
1.
IE Information Notice No. 79-20 2.
List of IE Information Notices Issued in 1979
< 1 ; : -, ~ r; u, c,,.. o v 7 000 04 0 f/52 /
SSINS: 6870 Accession No:
7908090260 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AST EhTORCEMENT WASHINGTON, D.C. 20555 August 14, 1979 IE Information Notice No. 79-20 NRC EhTORCEMENT POLICY - NRC LICENSED INDIVIDUALS
Background:
In the past, NRC licensed individuals have been cited by the NRC for failure These items of noncompliance to comply with the conditions of their licenses.
can generally be characterized as serious or repeated failures to follow reactor operating procedures. Two recent events involving the radiation overexposure of NRC licensed individuals through their violation of utility procedures, facility Technical Specifications and the Code of Federal Regulations have raised questions about the exercise of their responsibilities.
The purpose of this Information Notice is two-fold:
To remind the NRC licensed individuals of their responsibilities, not only (1) in the proper operation of the facility controls, but in compliance with the facility administrative procedures, and (2) To sumarize the enforcement sanctions available to the NRC for use against licensed individuals.
Description of Circumstances:
1.
Responsibilities Facility licensees are charged with the responsibility to design, construct and operate their plants in accordance with hTC requirements to assure that public health and safety are protected.
The role of h7C, licensed individuals is no less important in the overall Regulatory scheme. The NRC recognizes that timely actions by NRC licensed indivi-duals are an important part of safety. Reliance on these actions is a part of the defense-in-depth concept. Specifically, the hTC requires that:
1s (1) Only licensed operatorspMgad LapaD.inul&R.the_ CO?t/
that directly affect re j - -
~
dDUPLICATEDOCUMENT d* Ub (2) Licensed operators are y
all times during the op 1 Entire document previously entered 4 into system under:
n
^
]QD60Q02GQ No. of pages:
6
,4