ML19249B371
| ML19249B371 | |
| Person / Time | |
|---|---|
| Site: | 07001201, 07100115 |
| Issue date: | 07/31/1979 |
| From: | Zeff D BABCOCK & WILCOX CO. |
| To: | Macdonald C NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| Shared Package | |
| ML19249B372 | List: |
| References | |
| NUDOCS 7909040339 | |
| Download: ML19249B371 (4) | |
Text
-
~ re O
k, -
- kit?
'J PbR 7p pig
\\
2 Babcock & Nilco:C 93
~
l V-
,c tr, ruer cerere v c,cu; I
___l.
I
. /s[l//
P.O Boa 1260. Lyrchturg va m:5 e>
v am m sni N
N
- V.1uly ?1, 1979 4
p j(,.b.,
$1 A i,
' < ; 4, y %
~
Mr. C. E. MacDonald, Chief Transportation Branch
- o. ' '%
5, 7-i
,2.3 Division of fuel Cycle & Material Safety y
q~j United States fluclear Regulatory Commission j
Washington, D. C.
20555 NA, 4,
REFEREt;CES:
(1) S N-ll68, Docket 70-1201 (2) Shiopina Container OA Manual, submitted 12-11-78 (3) M ter to D. W. Zeff from C. E. MacDonald, 5-08-79 Gentlemen:
In response to your questions in Reference '3) above, we have revised s
the Shipping Container Duality Assurance Manual and cre enclosing the re-submittal as Attacnment I to this letter.
In preparing the resubmittal, we found that some of the questions could be answered by re' erring to other sections of the manual.
Attachment I outlines each of your questions as was done in Reference (3) above with reference to eitner a revised page or existing section as the response.
The revised pages are alsu included as part of Attachment I.
If you or any members of your staff have any questions or comments concerning this letter and the attachnent, please feel free to call myself (384-5111, Ext. 5211) or J.
- u. Watters (384-5111, Ext. 5966).
Sincerely, BABC0CK & WILC0X COMPAi,'Y COMMERCIAL fiUCLEGR FUEL PLAi;T
/
(p#/ p/w D. W. Zef f, Manager Safety, Licensing, and Safeguards D',1Z : cnn cc:
W. F. Heer J. P. Watters mi~wm
Enclosure:
Attachment I
<w 7 9 0 90 4 033f -M m ee m a w. c - r5 csteessnecies7
Babcock &Wilcox - COMMERCIAL NUCLEAR FUEL PLANT SNM-ll68 JULY 31,1979 h,'TACHMENT I Page 1 of 3 The following is a breakdown of each item that required cdditional information using your numbering system for the questions and the type of response to each question (i.e., either revised pages or reference to other section(s).
CHAPTER NAME/ NUMBER QUESTION NO.
RESPONSE
I - Organization 5
Revised Page J of Chapter 1, Section 1.3.1 II - Quality Assurance Program 1
Revised Page 2 of Chapter 2, Section 2.2.2 II - Quality Assurance Progran 3
Refer to Sections 2.2.1 and 2.2.3, Page 2 of Chapter 2 II - Quality Assurance Program 5
Refer to Section 3.2, Page 1 of Chapter 3 III - Design Control 3
Refer to Sections 3.3.4 and 3.4, Page 2 of Chapter 3 and Section 4.1, Page 1 of Chapter 4 III - Design Control 5
Revised Page 1 of Chapter 3, Section 3.3.2 III - Design Control 6
Refer to Section 3.3, Page 1 of Chapter 3 III - Design Centrol 7
Refer to Section 3.4, Page 2 of Chapter III IV - Procurement Document Control 2
Revised Page 1 of Chapter 4, Section 4.1 IV - Procurement Document Control 4
Refer to Section 4.1 and 4.2, Page 1 and 2 of Chapter 4 IV - Procurement Document Control 5
Refer to Section 7.5.1, Page 3 of Chapter 7 IV - Procurement Document Control 6
Refer to Sections 7.3 and 7.4, Page 2 of Chapter 7 VI - Document Control 4
Revised Page 1 of Chapter 6, Section 6.2.3 VI - Document Control 5
Refer to Sections 6.2.5, 6.2.5.1, and 6.2.5.2, Page 2 of Chapter 6 VII - Control of Purchased Materials, Parts, and Components 5
Refer to Section 8.2.1.3, Page 1 of (Part1)
Chapter 8 a
p _. 3,.. o a ;, -
o,f N,) d
- s
Babcock &Wilcox - COMMERCIAL flVCLEAP, FUEL PLA!1T SN!i-l lG8 JULY 31,1979 ATTArH!iENT I Page 2 of 3 CHAPTER FLAME / NUMBER QUESTION f!0.
RESPO!!SE VII - Control of Purchased fiaterials, Parts, & Components 5
Refer to Sections 15.4 and 15.5, Pages (Part2) 2 and 3 of Chapter 15 VIII - Identification and Control of Materials, Parts, and Components 3
Revised Page 1 of Chapter 8, Section 8.1 VIII - Identification and Control of liaterials, Parts, md Components 4
Revised Page 1 of Chapter 8, Section 8.1 X - Inspection 3
Revised Page 1 of Chapter 10, Section 10.1 X - Inspection 4
Revised Page 2 of Chapter 10, Section 10.2.1.3 XI - Test Control 2
Revised Page 2 of Chapter 11, Section 11.2.1.4 (new section)
XIII - Handling, Storage, and Shipping 2
Refer to Section 13.3.2, Page :
Chapter 3 XIII - Handling, Storage, and Shipping 3
Revised Page 2 of Chapter 13, new Section 13.3.4 XIII - Handling, Storage, and Shipping 4
Revised Page 2 of Chapter 13, Section 13.3.3 XIV - Inspection Test and Operating Status 3
Revised Page 1 of Chapter 14, Section 14.2 XVII - Quality Assurance Records 2
Revised Page 1 of Chapter 17, new Section 17.2.1 XVII - Quality Assurance Records 3
Revised Page 1 of Chapter 17, new Section 17.2.2 XVII - Quality Assurance Records 4
Revised Iage 1 of Chapter 17, new Section 17.2.2 XVII - Quality Assurance Records 5
Revised Page 2 of Chapter 17, new Section 17.3.3 e
O 1-
-] G L:
<f>
u t > ~i s s go I
Babcock &Wilcox - COMMERCIAL fiUCLEAP, FUEL PLAtlT Stiit-11o8 JULY 31,1979 AT A;HjjEE I Page 3 of 3 CHAPTER tlA"E/t; UMBER QUESTI0i4fi0.
RESP 0flSE XVII - Quality Assurance Records 6
Revised Page 1 of Chapter 17, (Part 1) r,ew Section 17.3.1 Xill - Quality Assurance Records 6
Revised Page 1 o# Chapter 17, (Part2) new Section 1/.3.1 XVII - Quality Assurance Records 6
Revised Page 1 of Chapter 17, (Part 3) new Section 17.3.1 XVII - Quality Assurance Records 6
Refer to Section 17.3.2, Page 2 (Part 4) of Chap +er 17 XVII - Quality Assurance Records 6
Revised Page 1 of Chapter 17, (Part 5) new Section 17.3.1 XVII - Quality Assurance Records 6
Revised Page 1 of Chapter 17, (Part 6) new Section 17.3.1 c,
,. ~o
- , \\ y n es.
9
%