Submits Clarification to Supplementary 790625 Response to IE Bulletin 79-06A,Revision 1.Corrects Wording & Replaces Sentences
ML19249B262
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 07/02/1979
From: Goodwin C
PORTLAND GENERAL ELECTRIC CO.
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
NUDOCS 7909040203
Download: ML19249B262 (2)


Text

-

T/O c m [:~

m Pcriland Generd Electric Ccmpany s

~l C m

.m

"U~~~

ih~ ~' tid E:ra,i al

. c_..1 :. o..

dn, r;

<m A

A

, q, g

July 2, 1979 h

\\' a 0 i

  • u.

,,r

.]

m 1 -

$, P ^-

Trojan Nuclear Plant

\\.--

t7 c>

Docket 50-344 k

Y License NPF-1 Mr. R. !!. Engelken, Director Nuclear Regulatory Commission Region V Suite 202, Walnut Creek Plaza 1990 N. California Blvd.

Walnut Creek, CA 94596

Dear Sir:

The following information clarifies our supplementary response of June 25, 1979, to your IE Bulletin 79-06A, Revision 1:

Bulletin Item 2 On Page 2, Section c of the PCE response in the fifth line, the werd " relieving" should be replaced by the word " retaining".

Bulletin Item 7.b On Page 6, the third sentence of the second paragraph of the PCE response should be replaced with the following sentence:

"Therefore, Plant procedures have been revised to permit termi-narion of the llPI pumps after 50 degrees subcooling has been achieved (by maintaining RCS pressure above the saturation limit as shown on Figure 3.2, Attachment 2) prior to 20 min only if it has been determined that continued operation would result in an unsafe Plant condition".

Bulletin Item 8 On Page 9, the Auxiliary Feedwater System should be add'i to the list of ESP Systems that were checked. The FSAR figure reference 3013G8 7009010<0 R 7

,j : :u

~.v ?g 7

Pcd!ad Cer.eral Eecide Ccnpcy M r. 11. II. Engelken July 2, 1979 Page 2 is Fi",ure 10.4-2.

On Page 10, the following sentence should be added to the PCE response:

"If the locked valve list is not main-tained in Modes 5 and 6, a physical verification of the locked valve posit ions is perf ormed".

Sincerely, f.

/

C. Goodwin Jr.

Assista:

Vice President Ther.ial

nt Operation and

!!a Intenanc e CG/CAZ/4sb5A29 c:

Mr. Lynn Frank, E! rector State of Oregon Department of Energy Office of Management In fo rma tion and Program Control nq q n q dvadu u

.