ML19249A573
From kanterella
Jump to navigation
Jump to search
ML19249A573 | |
Person / Time | |
---|---|
Site: | Prairie Island |
Issue date: | 06/30/1979 |
From: | EG&G, INC. |
To: | |
Shared Package | |
ML19249A571 | List: |
References | |
NUDOCS 7908230650 | |
Download: ML19249A573 (17) | |
Similar Documents at Prairie Island | |
---|---|
Category:GENERAL EXTERNAL TECHNICAL REPORTS
MONTHYEARML20217A9931999-09-30030 September 1999
[Table view]NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20211B5971999-07-31031 July 1999 Cycle 20 Voltage-Based Repair Criteria 90-Day Rept ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20196F4081999-06-23023 June 1999 Revised Pages 71,72 & 298 to Rev 7 of NSPNAD-8102, Prairie Island Nuclear Power Plant Reload Safety Evaluation Methods for Application to PI Units ML20202J7711999-02-0404 February 1999 Simulator Certification Rept for Prairie Island Plant Simulation Facility,1998 Annual Rept ML20202G3761999-01-31031 January 1999 Non-proprietary Rev 7 to NSPNAD-8102-NP, Prairie Island Nuclear Power Plant Reload SE Methods for Application to PI Units ML20196D7341998-11-20020 November 1998 Third Quarter 1998 & Oct 1998 Data Rept for Prairie Island Isfsi ML20198P0571998-09-0303 September 1998 Rev 1 to 95T047, Back-up Compressed Air Supply for Cooling Water Strainer Backwash Valve Actuator ML20236R6481998-07-15015 July 1998 Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at PINGP Unit 2 - Preliminary Summary Rept ML20247E2671998-05-0505 May 1998 Rev 0 to Pingp,Units 1 & 2,Pressure & Temp Limits Rept (Effective Until 35 Efpy) ML20216H0341998-03-31031 March 1998 Cycle-19 Voltage Based TSP Alternate Repair Criteria 90-Day Rept ML20217D2041998-03-13013 March 1998 Rev 1 to 28723-A, Intake Canal Liquefaction Analysis Rept for Pingp,Welch,Mn ML20236P9801998-03-12012 March 1998 Rev 0 to 97FP02-DOC-01, Compliance Review of 10CFR50,App R, Section Iii.O RCP Lube Oil Collection Sys ML20216D0911998-03-0606 March 1998 Rev 0 to Prairie Island Generating Plant,Units 1 & 2, Pressure & Temp Limits Rept ML20236Q0021998-02-28028 February 1998 Final Rept, Prairie Island Fire IPEEE Technical Assessment ML20216D1171998-02-28028 February 1998 Non-proprietary Final,Rev 2 to Prairie Island,Units 1 & 2, COMS Setpoint Analysis ML20198N8401998-01-0606 January 1998 Non-proprietary Version of Prairie Island Unit 1 Cycle 19 Thimble Deletion Study ML20212B7941997-10-20020 October 1997 Final Rept for Maximum Allowable Primary to Secondary Leak Rate Using ML20141F2771997-06-30030 June 1997 Non-proprietary Rept NSPNAD-97002, Slb Methodology ML20141A9911997-03-0707 March 1997 Rev 1 to Prairie Island Unit 2 45 F Ultrasonic Exam Rept (3rd 10yr) ML20141A9791997-03-0707 March 1997 F Ultrasonic Exam Rept (3rd 10yr) ML20135A9451997-02-28028 February 1997 Spent Fuel Pool Dilution Analysis ML20135A9481997-02-28028 February 1997 NSP Prairie Island Units 1 & 2 Spent Fuel Rack Criticality Analysis Using Soluble Boron Credit ML20136F3921997-02-28028 February 1997 Response to NRC Addl Info Request ML20138G7791996-12-18018 December 1996 Rev 20 to Operational QA Plan ML20132F2951996-12-12012 December 1996 Rev 0 to NSPLMI-96001, Prairie Island Nuclear Generating Plant Ipeee ML20115E8921995-12-31031 December 1995 FERC Form 1:Annual Rept of Major Electric Utils,Licensees & Others for NSP (Minnesota) & (Wisconsin) ML20094P0351995-11-20020 November 1995 NSP PINGP Units 1 & 2 USNRC USI A-46 Resolution Seismic Evaluation Rept ML20094P0451995-11-15015 November 1995 Rev 0 of Vol I of VI of NSP PINGP Units 1 & 2 USNRC USI A-46 Resolution Ssel & Relay Evaluation Rept ML20199A0251995-03-31031 March 1995 Firezone R Single & Multi-Conductor High Temperature 600 Volt,14 AWG-4/0 Awg Specification ML20078N9531995-01-26026 January 1995 Simulator Certification Rept for Prairie Island Plant Simlation Facility 1994 Annual Rept ML20058M8411993-08-18018 August 1993 Plant,Sbo/Esu Project, Design Rept, Rev 2 ML20056H0451993-04-30030 April 1993 Transient Power Distribution Methodology ML20045C1841993-02-28028 February 1993 Criticality Analysis of Prairie Island,Units 1 & 2 Fresh & Spent Fuel Racks. ML20248L4081992-09-0101 September 1992 Annual Rept Review of Meteorological Data 1991 Monticello & Prairie Island Stations ML20092A6671992-01-14014 January 1992 App B Suppl to Generic Licensing Topical Rept EDR-1, Summary of Plant Specific Crane Data Supplied by Ederer Inc for NSP Co Praire Island Nuclear Generating Plant Units 1 & 2 Auxiliary Bldg Crane ML20086T5631991-12-20020 December 1991 Rev 1 to Prairie Island Nuclear Generating Plant Station Blackout/Electrical Safeguards Upgrade Project ML20092A6791991-12-18018 December 1991 Design Criteria for Lifting Sys for TN-40 Dry Storage Cask at Praire Island ML20067B7211991-02-28028 February 1991 Revised Prairie Island Large Break LOCA Calculation Using WCAP-10924,Vol 1,Addenda 4 Model Changes ML20067C9301991-02-0101 February 1991 Simulator Certification Rept for Prairie Island Plant Simulation Facility ML20058J8881990-10-15015 October 1990 Design Rept for Facility Station Blackout/Electrical Safeguards Upgrade Project ML20011D6991989-12-12012 December 1989 Addendum 1 to, Sacm Diesel Generator Qualification Rept. ML20248D6491989-09-29029 September 1989 Rev 0 to Societe Alsacienne De Consts Mecaniques De Mulhouse Diesel Generator Qualification Rept ML20245L2891989-05-25025 May 1989 Used Molded Case Circuit Breakers Installed in Safety- Related Applications, Addendum 1 to Safety Evaluation 252 ML20245G7711989-04-28028 April 1989 Untraceable Molded Case Circuit Breakers Installed in Safety-Related Application, Safety Evaluation 265 ML20248J8881989-03-31031 March 1989 Criticality Analysis of Prairie Island Units 1 & 2 Fuel Racks ML20245L2631988-11-11011 November 1988 Used Molded Case Circuit Breakers Installed in Safety- Related Applications, Safety Evaluation 252 ML20154Q8981988-09-21021 September 1988 Criteria for Determining Justification for Continued Operation When Encountering Major Discrepancies in 'As-Built' Safety-Related Equipment ML20151Q2201988-08-31031 August 1988 Demonstration of Conformance of Prairie Island Units 1 & 2 to App K & 10CFR50.46 for Large Break Locas ML20150F2771988-06-30030 June 1988 Rev 1 to Safety Evaluation of Increased Fq & Fdeltah 1999-09-30 Category:TEXT-SAFETY REPORT MONTHYEARML20217G4461999-09-30030 September 1999
[Table view]Monthly Operating Repts for Sept 1999 for Pingp.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20216E7151999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with ML20211D3981999-08-24024 August 1999 Safety Evaluation Supporting Requested Actions to Licenses DPR-42 & DPR-60,respectively ML20211C2531999-08-0404 August 1999 Unit 1 ISI Summary Rept Interval 3,Period 2 Refueling Outage Dates 990425-990526 Cycle 19 971212-990526 ML20210Q4891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with ML20211B5971999-07-31031 July 1999 Cycle 20 Voltage-Based Repair Criteria 90-Day Rept ML20209J1131999-07-15015 July 1999 Safety Evaluation of Topical Rept NSPNAD-8102,rev 7 Reload Safety Evaluation Methods for Application to PI Units. Rept Acceptable for Referencing in Prairie Island Licensing Actions ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20209F9811999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20196F4081999-06-23023 June 1999 Revised Pages 71,72 & 298 to Rev 7 of NSPNAD-8102, Prairie Island Nuclear Power Plant Reload Safety Evaluation Methods for Application to PI Units ML20195G5181999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included ML20207B5931999-05-26026 May 1999 SER Accepting Licensee Proposed Alternative to ASME Code for Surface Exam (PT) of Seal Welds on Threaded Caps for Unit 1 Reactor Vessel Head Penetrations for part-length CRDMs ML20196L2501999-05-13013 May 1999 Rev 0 to PINGP Unit 1 COLR Cycle 20 ML20206L6191999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with ML20205N1081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with ML20205Q5101999-03-15015 March 1999 Inservice Insp Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 981109-1229 Cycle 19,970327-981229 ML20207J6951999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant ML20202J7711999-02-0404 February 1999 Simulator Certification Rept for Prairie Island Plant Simulation Facility,1998 Annual Rept ML20202G3761999-01-31031 January 1999 Non-proprietary Rev 7 to NSPNAD-8102-NP, Prairie Island Nuclear Power Plant Reload SE Methods for Application to PI Units ML20207L2811999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 ML20202J1731999-01-22022 January 1999 Safety Evaluation Concluding That NSP Proposed Alternative to Surface Exam Requirements of ASME BPV Code for CRD Mechanism Canopy Seal Welds Will Provide Acceptable Level of Quality & Safety ML20206P7861998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With ML20205H0561998-12-31031 December 1998 Northern States Power Co 1998 Annual Rept. with ML20198J6441998-12-17017 December 1998 Rev 0 to PINGP COLR Unit 2-Cycle 19 ML20206N2731998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20196D7341998-11-20020 November 1998 Third Quarter 1998 & Oct 1998 Data Rept for Prairie Island Isfsi ML20155K6301998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20154H4061998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Prairie Island Nuclear Generating Plant.With ML20202J7991998-09-30030 September 1998 Non-proprietary Version of Rev 3 to CEN-629-NP, Repair of W Series 44 & 51 SG Tubes Using Leaktight Sleeves,Final Rept ML20198P0571998-09-0303 September 1998 Rev 1 to 95T047, Back-up Compressed Air Supply for Cooling Water Strainer Backwash Valve Actuator ML20153B0761998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Prairie Island Nuclear Generating Plant.With ML20237A3961998-08-11011 August 1998 Safety Evaluation on Westinghouse Owners Group Proposed Insp Program for part-length CRDM Housing Issue.Insp Program for Type 309 Welds Inadequate from Statistical Point of View ML20237A8171998-08-0505 August 1998 SER Related to USI A-46 Program GL 87-02 Implementation for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20236X8531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Prairie Island Nuclear Generating Plant ML20236R6481998-07-15015 July 1998 Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at PINGP Unit 2 - Preliminary Summary Rept ML20236R0771998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Prairie Island Nuclear Generating Plant ML20249A5751998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Prairie Island Nuclear Generating Plant ML20247G7011998-05-31031 May 1998 Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at Prairie Island Nuclear Generating Plant,Unit 2 ML20248M0561998-05-31031 May 1998 Rev 5 to CEN-620-NP, Series 44 & 51 Design SG Tube Repair Using Tube Rerolling Technique ML20247E2671998-05-0505 May 1998 Rev 0 to Pingp,Units 1 & 2,Pressure & Temp Limits Rept (Effective Until 35 Efpy) ML20247G2921998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Prairie Island Nuclear Generating Plant ML20217M6901998-04-29029 April 1998 Safety Evaluation Accepting Methodology for Relocation of Reactor Coolant Sys P/T Limit Curves & LTOP Sys Limits Proposed by NSP for Pingp,Units 1 & 2 ML20216C6361998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Prairie Nuclear Generating Plant Units 1 & 2 ML20216H0341998-03-31031 March 1998 Cycle-19 Voltage Based TSP Alternate Repair Criteria 90-Day Rept ML20217D2041998-03-13013 March 1998 Rev 1 to 28723-A, Intake Canal Liquefaction Analysis Rept for Pingp,Welch,Mn ML20236P9801998-03-12012 March 1998 Rev 0 to 97FP02-DOC-01, Compliance Review of 10CFR50,App R, Section Iii.O RCP Lube Oil Collection Sys ML20248L3931998-03-10010 March 1998 ISI Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 971018-971212 Cycle 18,960303-971212 ML20216D0911998-03-0606 March 1998 Rev 0 to Prairie Island Generating Plant,Units 1 & 2, Pressure & Temp Limits Rept 1999-09-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML19249A573&oldid=1894324"