ML19249A559
From kanterella
Jump to navigation
Jump to search
ML19249A559 | |
Person / Time | |
---|---|
Site: | 05000495 |
Issue date: | 08/17/1979 |
From: | STONE & WEBSTER, INC. |
To: | |
Shared Package | |
ML19249A558 | List: |
References | |
NUDOCS 7908230605 | |
Download: ML19249A559 (6) | |
Similar Documents at 05000495 | |
---|---|
Category:REFERENCE SAFETY ANALYSIS REPORT & AMENDMENTS (RSAR)
MONTHYEARML19290E5541980-03-17017 March 1980
[Table view]Amend 42 to SWESSAR-P1 ML19249A5591979-08-17017 August 1979 Amend 41 to S&W Std SAR,SWESSAR-P1 ML19241B7321979-07-16016 July 1979 Amend 40 to SSAR,SWESSAR-P1.Amend Addresses Extent to Which Design Complies W/Regulatory Requirements Review Committee Category I Items ML19312A2241978-12-29029 December 1978 App a of S&W SWESSAR-P1, Encl Bldg W/O Mixing. ML19312A2051978-11-29029 November 1978 Chapter 1 of S&W SWESSAR-P1, Introduction & General Description of Plant. ML19312A2061978-11-29029 November 1978 Chapter 2 of S&W SWESSAR-P1, Site Characteristics. ML19312A2071978-11-29029 November 1978 Chapter 3 of S&W SWESSAR-P1, Design of Structures, Components,Equipment & Sys. ML19312A2081978-11-29029 November 1978 Chapter 4 of S&W SWESSAR-P1, Reactor. ML19312A2091978-11-29029 November 1978 Chapter 5 of S&W SWESSAR-P1, RCS & Connected Sys. ML19312A2101978-11-29029 November 1978 Chapter 6 of S&W SWESSAR-P1, Engineered Safety Features. ML19312A2111978-11-29029 November 1978 Chapter 8 of S&W SWESSAR-P1, Electric Power. ML19312A2121978-11-29029 November 1978 Chapter 9 of S&W SWESSAR-P1, Auxiliary Sys. ML19312A2131978-11-29029 November 1978 Chapter 10 of S&W SWESSAR-P1, Steam & Power Conversion Sys. ML19312A2141978-11-29029 November 1978 Chapter 11 of S&W SWESSAR-P1, Radwaste Mgt. ML19312A2151978-11-29029 November 1978 Chapter 12 of S&W SWESSAR-P1, Radiation Protection. ML19312A2161978-11-29029 November 1978 Chapter 13 of S&W SWESSAR-P1, Conduct of Operations. ML19312A2171978-11-29029 November 1978 Chapter 14 of S&W SWESSAR-P1, Initial Tests & Operations. ML19312A2181978-11-29029 November 1978 Chapter 15 of S&W SWESSAR-P1, Accident Analysis. ML19312A2201978-11-29029 November 1978 Chapter 16 of S&W SWESSAR-P1, Tech Specs. ML19312A2221978-11-29029 November 1978 Chapter 17 of S&W SWESSAR-P1, Qa. ML19312A2251978-11-29029 November 1978 App B of S&W SWESSAR-P1, Encl Bldg W/Mixing. 1980-03-17 Category:TEXT-SAFETY REPORT MONTHYEARML19290E5541980-03-17017 March 1980
[Table view]Amend 42 to SWESSAR-P1 ML19249A5591979-08-17017 August 1979 Amend 41 to S&W Std SAR,SWESSAR-P1 ML19241B7321979-07-16016 July 1979 Amend 40 to SSAR,SWESSAR-P1.Amend Addresses Extent to Which Design Complies W/Regulatory Requirements Review Committee Category I Items ML19312A2241978-12-29029 December 1978 App a of S&W SWESSAR-P1, Encl Bldg W/O Mixing. ML19312A2141978-11-29029 November 1978 Chapter 11 of S&W SWESSAR-P1, Radwaste Mgt. ML19312A2051978-11-29029 November 1978 Chapter 1 of S&W SWESSAR-P1, Introduction & General Description of Plant. ML19312A2061978-11-29029 November 1978 Chapter 2 of S&W SWESSAR-P1, Site Characteristics. ML19312A2071978-11-29029 November 1978 Chapter 3 of S&W SWESSAR-P1, Design of Structures, Components,Equipment & Sys. ML19312A2081978-11-29029 November 1978 Chapter 4 of S&W SWESSAR-P1, Reactor. ML19312A2091978-11-29029 November 1978 Chapter 5 of S&W SWESSAR-P1, RCS & Connected Sys. ML19312A2101978-11-29029 November 1978 Chapter 6 of S&W SWESSAR-P1, Engineered Safety Features. ML19312A2111978-11-29029 November 1978 Chapter 8 of S&W SWESSAR-P1, Electric Power. ML19312A2121978-11-29029 November 1978 Chapter 9 of S&W SWESSAR-P1, Auxiliary Sys. ML19312A2131978-11-29029 November 1978 Chapter 10 of S&W SWESSAR-P1, Steam & Power Conversion Sys. ML19312A2151978-11-29029 November 1978 Chapter 12 of S&W SWESSAR-P1, Radiation Protection. ML19312A2161978-11-29029 November 1978 Chapter 13 of S&W SWESSAR-P1, Conduct of Operations. ML19312A2171978-11-29029 November 1978 Chapter 14 of S&W SWESSAR-P1, Initial Tests & Operations. ML19312A2181978-11-29029 November 1978 Chapter 15 of S&W SWESSAR-P1, Accident Analysis. ML19312A2201978-11-29029 November 1978 Chapter 16 of S&W SWESSAR-P1, Tech Specs. ML19312A2221978-11-29029 November 1978 Chapter 17 of S&W SWESSAR-P1, Qa. ML19312A2251978-11-29029 November 1978 App B of S&W SWESSAR-P1, Encl Bldg W/Mixing. ML20126F1971977-04-30030 April 1977 Safety Evaluation Report Related to the Preliminary Design of the SWESSAR-P1 Standard PWR Reference Nuclear Power Plant (and ITS Relationship to the RESAR-3S Standard Reference System) 1980-03-17 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML19249A559&oldid=1894328"