Text
.
f(-
I
[pa asog o
UNITED STATES 8" 33 ',g NUCLEAR REGULATORY COMMISSION I '
t WASHINf. TON, D. C. 20555 g
, S Q
o
%*****/
1.
JUL 2 31979 MEMCRANDJM FOR:
A. Schwencer, Chief, Operating Reactors Branch #1, DDR D. Ziemann, Chief, Operating Reactors Branch #2, 00R T. Ippolito, Chief, Operating Reactors Branch #3, D0R R. Reid, Chief, Operating e ctors Branch #4, D0R IMnt ire r for Operating Reactor FROM:
G m
Projects,D0R R. Vollmer,
- ant Director for Systematic Evaluation Program, D
SUBJECT:
FIRE PROTECTION IMPLEMENTATION SCHEDULES We have recently reviewed the status of the implementation schedules for fire protection modifications. Some of the licensees have been requesting slippages and we have granted them.
As you know, the schedule for completion of all fire protection modifications that was given to the Commissioners was October 1980. By their Memorandum
.ind Order in the inatter of the Union of Concerned Scientists' Petition for Emergency and Remedial Action, dated April 13, 1978, the Commission directed the staff to use their best efforts to maintain this schedule, and also directed that the Commission be advised if any slippage is anticipated, along with the suggested corrective actions.
All the PM's who still have to issue the license amendment and fire protection SER for their plants should keep this October 1980 date in mind when getting che schedules for completion dates.
All the PM's wl o have already issued the fire protection amendment should check.aeir completion dates.
If all of the dates are prior to October 1980, send the licensee sample letter #1 to forestall as much as possible any requested slippages.
If any dates fall af ter October 1980, send the licensee sample letter #2 to encourage their best efforts for improvements of the schedule.
If a licensee has made late submittals in the past, the PM should add a paragraph to the letter which points this out to the licensee and admonishes them to meet all submittal schedules in the future. These letters should be issued within the next two weeks.
I hkj 7908220/5pg
.' The sample letters are on Vydec Tape #1 (for Tape see Donna Nottingham).
If you have any questions, contact Tom Wambach, X-27038.
h4 Dr kwn.
'/
W.Gambill,AssistantDirector
. Vo'llmer, Assistant Director for Operating Reactor Projects for Systematic Evaluation Program Division of Operating Reactors Division of Operating Reactors
Enclosure:
As stated cc:
G. Lainas R. Ferguson T. Wambach
'Idk
) f Q
/
'o UNITED STATES E
'N NUCLEAR REGULATORY COMMISSION h
WASHING TON, D. C. 20555
,7
%*****/
SAMPLE LETTER #1 Licensee:
Gentlemen:
In May 1976, we issued guidelines reflecting the NRC's policy regarding the implementation of General Design Criterion 3 - Fire Protection.
Since that time,you have performed a fire hazards analysis for your f acility and have compared its fire protection program with tne NRC guidelines.
In late 1976, ve set October 1980 as the date for completing the imple-mentation of all modifications associated with this program. This implementation schedule recognized that such modifications should be completed as soon as practical, with due consideration of the nature of the modifications. For example, minor modifications, adoption of administrative controls and additional pcreable equip-ment would be completed within six months; however, major modifications would require a year or more to complete and some modifications would be coordinated with refueling outages.
By their Memorandum and Order in the matter of the Union of Concerned Scientists' Petition for Energency and Remedial Action, dated April 13, 1978, the Commission airected the staff to use their best ef forts to maintain this schedule, and also directed that the Commission be advised if any slippage is anticipated, along with suggested corrective actions.
We urge you to apply your best efforts to maintain your schedules for completion of all of the fire protection modifications at your facility (ies) and to submit, on an expedited basis, any information that is still outstanding with regard to open items and required design details.
- incerely,
%.1E l I png Di ectbr W
Eisenlut, c't Division of Operating Reactors Office of Nuclear Reactor Regulation
~
' 844 318
P UNITED ST ATES E
I,g NUCLEAR REGULATORY COMMISSION
'J j
WASHINGTON, D. C. 20555
/
SAMPLE LETTER #2 Licensee:
Gentlemen:
In May 1976, we issued guidelines reflecting the NRC's policy rega-ding the implementation of General Design Criterion 3 - Fire Protection.
Since that time,you have performed a fire hazards analysis for your facility and have compared its fire protection program with tne NRC guidelines.
In late 1976, we set October 1980 as the date for completing the imple-mentation of all modifications associated with this ?rogram. This imple. mentation schedule recognized that such modifications should be completed as soon as pract' cal, with due consideration of the nature of the modifications.
/or example, minor modifications, adoption of administrative controls and additional portable equip-ment would be completed within six months; however, major modifications would require a year or more to complete and some modifications would be coordinated with refueling outages.
By their Memorandum and Order in the matter of the Union of Concerned Scientists' Petition for Emergeny and Remedial Action, dated April 13, 1978, the Commission directed the staff to use their best efforts to maintain this schedule, and also directed that the Commission be advised if any slippage is anticipated, along with suggested corrective actions.
We urge you to apply your best efforts to improve your schedules for completion of as many of the fire protection modifications at your facility as possible prior to October 1980 and to submit c) an expedited basis any information that is still outstanding with regard to open items and required design details.
- incerely, 4
-d & J D.
isenhut, Acting Director Division of Operating Reactors Office of Nuclear Reactor Regulat;cn fhk4 ))h