ML19249A327

From kanterella
Jump to navigation Jump to search
Discusses Re Proposed Mods & Expansion,Which Stated No Addl Info Will Be Submitted.Notes Some Relevant Sections of Fundamental Nuclear Matl Control Plan That Will Require Revision & Approval Prior to Beginning Operations
ML19249A327
Person / Time
Site: Framatome ANP Richland
Issue date: 07/26/1979
From: Partlow J
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Nilson R
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
References
SGML:HB, NUDOCS 7908220078
Download: ML19249A327 (1)


Text

Y a

nrDK

%:.a as c<.

UNITED STATES NUCLEAR REGULATORY COMMISSION

' [

,3

,,.%' jl!h;Aj*

WASHINGTON, O. C. 20555 o

JUL 2 61979

+...-

iML:HB 10-1257 w

Exxon Nuclear Company, Inc.

Research and Technology Center ATTN:

Dr. R. Nilson, Manager Licensing

?955 George Washington Way Richland, Washington 99352 bentlemen:

Reference is made to the letter from H. Paul Estey, Manager, Licensing and Compliance, Richland Facilities to Mr. William T. Crow, NRC, dated June 22, 1979.

In his letter Mr. Estey writcs of proposed modifications and expansions of the Richland facility.

In his summary pages (enclosed) he notes tiiat no additional infonnation will be submitted.

If this statement is taken in te literal sense, we would have to take exception since certain parts of 0 CFR 70 would require revised sections to the Fundamentai Nuclear

aterial Control Plan. Among these requirements are the follcwing:

1 10 CFR 70.51(e)(5) - LEID model 10 Cr'R 70.51(f)(1) through (4) - inventory procedures

?.

10 CFR 70.57(b) - measurement control plan 10 CFR 70.57(b)(4) - process and engineering tests for sampling 4.

5.

10 CFR 70.57(b)(6) - engineering analysis and evaluations of design, installation, preoperational tests, calibration, and operation of each measurement system.

This list is not complete and is only given for an example of the additional data that may be required.

We request that you review the above items and others found in 10 CFR 70 to provide assurance that if they apply to your oroposed operation that they wili be addressed by providing revised pages to your FNMC Plan for NRC review dnd approval prior to b^ ginning cperations.

Si ncerely[,

\\A)OcK t

r\\

Jam s G. Partlow, Chief Ma(rialControl& Accountability Ltcensing Branch Division of Safeguards 844 i

'290822