't PACIFIC GAS AND ELECTR,IC C O M PANY 2'W3

[

(707) 443 0821 1034 SIXTH STREET EUREKA, C ALIFO R NI A 95501 ROY C. ATKIN S nouector oms om managre August 13, 1979 Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Docket No. 50-133 License No. DPR-7 Gentlemen:

Enclosed are the comple'.ed monthly report forms and the narrative of operating and major maintenance experience for Humboldt Bay Power Plant Unit No. 3 (HBPP-Unit 3) for July, 1979. These forms and the narrative are submittel in accordance with Section IX I.l.c of our Technical Specifications.

Sincerely, m

/

_' /j{

.s c/?.:-

E. D. Weeks Plant Superintendent

.;amboldt B., h va cl nt 1034 Sixth Street

&,w.ka, Califoryfa 05 M' (707-443-lh?)

Enclosure cc:

Mr. W. H. Barr Mr. R. H. Engelken, Director Directorate of Regulatory Operatfoas Region V Office U. S. Nuclear Regulatory Commission 1990 N. California Boulevard g

Walnut Creek Plaza, Suite 202 g4)

I

(

6 Walnut Creek, California 94596

\\

EDWeeks:me

(

org 7908210 20 / g

(

MONTHLY liARFATIVE REPORT OF OPERATI::G A'?D MAJOR d'.uSTENA ;CE EXPERIENCE This report describes the operating and majer maintenance experience or the month of July, 1979.

This report was prepared by the Plant Staff and is submitted in accordance with Secticn IX:I.1.c. of the Technical Specifications.

During the report period the reactot remained in the cold shutdown : ode ci operation. There were no significant ev(nts asyciated with the c; erat.an or the Unit.

There,as ne signiftcant raintenance corpleted during the tenth.