ML19248D403

From kanterella
Jump to navigation Jump to search
Recommends Resolution of Containment Purge Issue Prior to TMI-1 Operation.Licensee Response to Generic Ltr Should Be Evaluated & Resolved Prior to Operation
ML19248D403
Person / Time
Site: Crane  Constellation icon.png
Issue date: 07/09/1979
From: Lainas G
Office of Nuclear Reactor Regulation
To: Engle L
Office of Nuclear Reactor Regulation
References
NUDOCS 7908150742
Download: ML19248D403 (1)


Text

.

e DISTRIBUTI0f4 Central Files llRC PDR a 99 PSB Reading

~

fj\\.

"EMORAi4DUM FOR:

L. Engle, Project !!anager, Light Water Reactors,#1, DPM FROM:

G. Lainas, Chief, Plant Systems Branch, DOR

SUBJECT:

T'1I-l RESTART ACTI0 tis We have been requested to provide you with any reconnended actions we believe necessary for TMI-l restart.

Considering the limited time we have been given to respond to this request, we have only one corrent in the area of the containment systens. The containment isolation capability is one of the bulletin itens.

However, we recontend that the containnent purge issue (i.e., justification for containnent nurging during nomal operation) be resolved prior to operation.

The licensee has responded to our generic letter and his response should be evaluated and resolved prior to operation.

G. Lainas, Chief Plant " *cns Branch Division of Operating Reactors cc:

3. Grines J. Stolz E. Atansan D. Tondi R. Ferguson 79 0 815 07Q M

SL-FJ XR C-PSB:00R

.,,c.,

_ EMen s am GLainM:dn 7/ ',/ 79 7/

/ 79 NEC POR M 318 ( 9.?6 ) NR CM 32 40 W s. s. 3a v s = = = = = r = = = tim e o - c a. i. v e - r e s d , {

[ i ft (-

/-

  • Qo Q e