ML19248D380
| ML19248D380 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 06/20/1979 |
| From: | Mattson R Office of Nuclear Reactor Regulation |
| To: | Stello V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML19248D372 | List: |
| References | |
| NUDOCS 7908150707 | |
| Download: ML19248D380 (1) | |
Text
-
.1 a --
a t
s s-f-
i e
1 A
[.'.8Ce"4 s
uNn CD STATCs '
.M m ' 'n NUCLEAR 3EGULATORY CCMMISSION
~
!, Rfj.3 y emo,,w ma. o. c. 2 nss
- n.%p -
e
- .'W
.i v
,,t,...,+e A'.1 t 0 Um P.EF.ORASCUM FOR:
V.
Stello, Director Office of Inspection and Enforcer..ent s ',M -
R. J. Mattson, Director Division of Syster.c Safety, NRR SUdJECT:
HPI PUMP PER.CP.P.ANCE DURING THE TMI.4CCIDE!iT 2., ed on
- v understanding of the results of the investigation of the
.v.: accident currently available,.T.sny of the significant systt and eyip ent per.ir.mance questicns have been ic.cntified and wr4 cn th tir c.ewric implicaticas is underway.
!!cua' tan, tPS c:Ur: ;f the 731 fent.
iionirig of the High Pressure injection Eyst27. pumps Juring the accident c :HI has not been suf ficiently characterized at this ti as.
There 3;; ears to be ccafiicting infor.ation as to whether the frequent trip-ping of the HP: pumps and alleged diffical ty in their restarting was an c;cr2 tor prebiem or a design (mechanical, diectrical, and cc.itrols) pr:bkm.
The f.essc.ns Leerned Task Force r': quests that the irvestigation
/ the cane of tae frequent tripping of these pur.'ps during the first.ixtaren 1, curs of the accident be given a higher priority in order that any
.;n ; ficent ge 3eric implications for r2 actor safaty be quickly.&ati-fisd.
CN m' ->- = d by E c c..!
son
'>cger J. Mattc.cn, Ci rector Divisica of Syste::s Safety of fice of Nucicar Reactor Reguletien cc:
Std tLIF Dist.
- - c. :S cley, IL
r ti n, IE, Re9 I R.
acgovin, NRC Investiption a
W. Jchns ton, NRC :nv?stigation
?]R 0 90815cacs P0BRFPmiv?t.
' m.
m-
. mal