Text

N e-f aarc o 9

'o, UNITED STATES EY t' %

NUCLEAR REGULATORY COMMISSION

$.,M._)f

,5

.,l WASHINGTON, D. C. 20555 k'N//

Jul 95m

+...*

Project M-3 Docket ?;o. 70-1257 Exxon fluclear Ccmpany, Inc.

ATTN:

Mr. 'a'arren S. Nechodon, Manager Licensing and Ccmpliance Research and Tecnnolcgy Center 2955 George Washington 'c!ay Richland, Washington 99352 Gentlemen:

The purpose of this letter is to transmit for your information an increment of the analysis of the effects of natural phenomena relative to the plutonium fabrication operations at your Richland site. The subject increment of analysis is a seismic risk analysis applicable to the geographic area arc nd your facility. A draft of the enclosure has been reviewed, and commented upon, by those analysts who require the results to carry out succeeding analyses and by NRC staff.

The !!RC staff has adopted this final version of the review for application in succeeding analyses.

However, we will consider challenge of our position when supported by credible technical bases.

Any coments on the enclosed analysis should be addressed to James E. Ayer of this Branch.

He will direct resolution of ccmments and any justifiable revision of the analysis.

Sincerely,

)

/

A V ~h Leland C. Rousef, Acting Chief Fuel Reprocessing and Recycle Branch Division of Fuel Cycle and Material Safety

Enclosure:

As stated U.'.l.31.2 L7(6 79081500

.