ML19248D317
ML19248D317 | |
Person / Time | |
---|---|
Site: | Peach Bottom |
Issue date: | 08/10/1979 |
From: | PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
To: | |
Shared Package | |
ML19248D312 | List: |
References | |
NUDOCS 7908150588 | |
Download: ML19248D317 (153) | |
Similar Documents at Peach Bottom | |
---|---|
Category:GENERAL EXTERNAL TECHNICAL REPORTS
MONTHYEARML20206P1651998-12-31031 December 1998
[Table view]Fire Protection for Operating Nuclear Power Plants, Section Iii.F, Automatic Fire Detection ML20196E8261998-11-30030 November 1998 Response to NRC RAI Re Reactor Pressure Vessel Structural Integrity at Peach Bottom Units 2 & 3 ML20199J6981997-11-11011 November 1997 Rev 2 to 10CFR50.59 Review for Jet Pump Thermal Sleeve Cracking ML20202H1231997-09-30030 September 1997 Small Project Joint Permit Application & Attachments for PECO Energy Co,Peach Bottom Atomic Power Station,Rock Run Creek Low Flow Crossing, to Satisfy PA Dept of Environ Protection & Us Army Corps of Engineers ML20129E8711996-09-26026 September 1996 Rev 0 to 10CFR50.59 Review for Ncr Pb 96-03414,Core Spray T-Box Cracks for Peach Bottom Atomic Power Station,Unit 2 ML20117E6351996-05-31031 May 1996 Seismic Evaluation Rept for Pbaps ML20117E6321996-05-31031 May 1996 USI A-46 Relay Evaluation Rept for PBAPS Units 2 & 3 ML20117E6251996-05-31031 May 1996 Seismic Safe Shutdown Equipment List for PBAPS Units 2 & 3 ML20129A4511996-01-11011 January 1996 Core Spray Sparger Downcomer Modification ML20129A4731995-12-11011 December 1995 Fabrication of Core Spray Line Downcomer Clamp ML20092M8921995-09-30030 September 1995 Shroud Vertical Team Weld Evaluation ML20098B1141995-09-30030 September 1995 Evaluation of Peach Bottom Unit 3 Core Spray Line ML20098B1211995-09-30030 September 1995 Residual Stress Analysis of Peach Bottom Unit 3 Core Spray Pipe to Sleeve Fillet Weld ML20092J8151995-09-15015 September 1995 Core Spray Line Tee-Box Analysis Rept for Peach Bottom Atomic Power Station Unit 3 ML20094H0521995-06-30030 June 1995 Pyrolysis Gas Chromatography Analysis of 21 Thermo-Lag Fire Barrier Samples ML20092K9871995-06-13013 June 1995 Rev 3 to Shroud Stabilizer Hardware ML20083K6611995-04-26026 April 1995 Rev a to Upgraded Eals ML20077M0861995-01-31031 January 1995 Nonproprietary TS Improvement Analysis for RPS for PBAPS, Units 2 & 3 ML20077M0951995-01-31031 January 1995 Nonproprietary TS Improvement Analysis for ECCS Actuation Instrumentation for Pbaps,Units 2 & 3 ML20073J7501994-09-30030 September 1994 Shroud Mechnical Repair Program,Peach Bottom Shroud & Shroud Repair Hardware Stress Analysis ML20079S0911994-09-29029 September 1994 Rev 0 to Application of Screening Criteria ML20073J7411994-09-24024 September 1994 Rev 0 to Stress Rept 25A5607, Shroud Stabilizers ML20072P5791994-08-26026 August 1994 Power System Harmonic Study for Peach Bottom Nuclear Power Plant, Final Rept ML20072L9631993-12-13013 December 1993 Evaluation & Screening Criteria for Peach Bottom Unit-2 Shroud ML20064K4291993-12-0303 December 1993 Evaluation & Screening Criteria for Peach Bottom Unit 3 Shroud Indications ML20059L1391993-11-30030 November 1993 Core Spray Crack Analysis for Peach Bottom Unit 3 ML20059G0901993-10-27027 October 1993 Evaluation & Screening Criteria for Peach Bottom Unit-3 Shroud Indications ML20149G0401993-05-30030 May 1993 Fatigue Evaluation of Peach Bottom II & III Reactor Vessels ML20118A3641992-08-26026 August 1992 Vols 1 & 2 of Individual Plant Exam,Peach Bottom Atomic Power Station Units 2 & 3 ML20073E5881991-04-30030 April 1991 Revised Station Blackout Analysis ML20073D0221991-04-30030 April 1991 Full Structural Weld Overlay Design for Peach Bottom Unit 2 RWCU Weld 12-I-1D ML20067E5051991-02-0808 February 1991 Simulator Performance Rept. W/Two Oversize Drawings ML20067E5091991-01-28028 January 1991 Malfunction Causes & Effects ML20055J3291990-07-20020 July 1990 Decommissioning Rept of Philadelphia Electric Co ML20055J3231990-07-20020 July 1990 Decommissioning Rept of Philadelphia Electric Co ML18095A3791990-07-20020 July 1990 Decommissioning Rept of Philadelphia Electric Co ML20055J3271990-07-20020 July 1990 Decommissioning Rept of Philadelphia Electric Co ML20044H3281990-02-23023 February 1990 Rev a to 30-Month Stability Spec for Rosemount Models 1152, 1153 & 1154 Pressure Transmitters ML20247N3951989-05-16016 May 1989 Methods for Performing BWR Reload Safety Evaluations ML20236A8501989-01-31031 January 1989 Voltage Regulation Study ML20236A8351989-01-31031 January 1989 Rev 1 to Peach Bottom Atomic Power Station Units 2 & 3, Verification of Calculated Auxiliary Distribution Sys Voltages by Test ML20206K3021988-10-31031 October 1988 Rev 1 to Impact of Reg Guide 1.99,Rev 2 on Peach Bottom Atomic Power Station Unit 3 ML20206K3101988-10-31031 October 1988 Rev 1 to Impact of Reg Guide 1.99,Rev 2 on Limerick Generating Station Unit 1 ML20151M5501988-07-15015 July 1988 Security Problem Root Cause Assessment ML20147A7971988-02-23023 February 1988 Root Cause Investigation of Shutdown Cooling Isolations Peach Bottom Atomic Power Station ML20148H1211988-01-15015 January 1988 Rev 0 to Peach Bottom Atomic Power Station,Units 2 & 3, Response to IE Bulletin 85-003 ML20149D6981988-01-13013 January 1988 Methods for Performing BWR Steady-State Reactor Physics Analyses ML20196K0311987-12-31031 December 1987 1987 Annual Plant Mod Rept,Per 10CFR50.59 ML20236V3311987-11-20020 November 1987 SAR for Peach Bottom Atomic Power Station Spds ML20236J7141987-10-28028 October 1987 Commitment to Exellence Action Plan Status Rept 1998-12-31 Category:TEXT-SAFETY REPORT MONTHYEAR05000278/LER-1999-005-03, :on 990920,uplanned Esfas During Planned Mod Activitives in Main CR Were Noted.Caused by Inattention to Detail by Individuals Performing Work.All CR Mods Were Ceased to Allow Review of Mod Work Packages.With1999-10-20020 October 1999
[Table view]
ML20153B9651998-09-14014 September 1998 Safety Evaluation Supporting Amend 9 to License DPR-12 1999-09-30 |