1 TI 2595/2 Page 1 of 2
=
OFFICE OF INSPECTION AND ENFORCEMENT B&W SITE INSPECTOR DAILY REPORT J.
Date 4/19/79 Site Rancho Seco Inspector (s)
A. Johnson P. Johnson p._.._.
General Plant Status:
100% Power.
No known oroblems.
l-1.
SUMMARY
OF LICENSEE RESPONSE TO IE BULLETING 79-05 AND SUPPLEMENTS:
a.
Review of Similar Transients (Item 2 of IES79-05A):
Completed (as specified in 4/12/79 report).
b.
Review ano'. Revision of Operating and Maintenance Procedures
-~
(Items 3, 4, 5, 7, 8, 9, 10 of IEB 79-05A):
Same as stated in 4/15/79 report.
c.
Review and Implementation of Changes in Containment Isolation
- (Item 6 IES 79-054A):
Completed (as specified in 4/10/79 report).
7
'b'hdh d.
Training of Plant Personnel (Items 1, 4,11 and plant / procedures changes):
All but one licensed operator have completed licensee's training
,29 I$.
'qq,)
Q 7 90702 06NO T
bf/R R
I TI 2595/2 Page 2 of 2 2.
SUPP.ARY OF NRC INSPECTION ACTIVITY DURING PERIOD 4/18/79 (Address Items 1.a. thru 2.d. above, plus other independent /significant effort, identify shifts on which activity was done during past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />):
Inspection coverage from 6:00 Ari to 6:30 PM - Conducted control room surveillance; with SMUD management, accompanied Congressman Shumway on tour of plant; reviewed procedures issued pursuant to IEB 79-05A.
Con-tinued review of changes made to containment isolation valves.
3.
STATUS OF INSPECTOR DISCUSSIONS WITH PLANT PERSONNEL:
Completed.
Discussions with the last two licensed operators conducted 4/18/79.
4.
DESCRIPTION OF GENERAL PLANT STATUS (i.e., operating power level, planned changes, scheduled outages, ESF out of service, major maintenance, reportable occurences, etc.)
100% power, no known problems, no significant surveillance scheduled, no j
ESF Systems out of service; a one-day outage is scheduled for 5/12/79 l
(see 4/18/79 report).
f t
Sumary of TI 2595/2 items complete to date:
III.A - Complete III.B - Complete except for (1) operator.
III.C - Complete except for the one possible discrepancy noted in Paragraph 2 above.
III.D - Complete V - Complete mt l$f b
5
.