B&W Site Inspector Daily Rept on 790419.Plant Status:Full Power W/No Known Problems.Surveyed Control Room Activities W/Congressman Shumway & Util Representatives
ML19248C545
Person / Time
Site: Rancho Seco
Issue date: 04/19/1979
From: Andrea Johnson, Johnson P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML19246A470 List:
References
FOIA-79-98 TI 2595-2, TI-2595-2, NUDOCS 7907020080
Download: ML19248C545 (2)


Text

-

1 TI 2595/2 Page 1 of 2

=

OFFICE OF INSPECTION AND ENFORCEMENT B&W SITE INSPECTOR DAILY REPORT J.

Date 4/19/79 Site Rancho Seco Inspector (s)

A. Johnson P. Johnson p._.._.

General Plant Status:

100% Power.

No known oroblems.

l-1.

SUMMARY

OF LICENSEE RESPONSE TO IE BULLETING 79-05 AND SUPPLEMENTS:

a.

Review of Similar Transients (Item 2 of IES79-05A):

Completed (as specified in 4/12/79 report).

b.

Review ano'. Revision of Operating and Maintenance Procedures

-~

(Items 3, 4, 5, 7, 8, 9, 10 of IEB 79-05A):

Same as stated in 4/15/79 report.

c.

Review and Implementation of Changes in Containment Isolation

  • (Item 6 IES 79-054A):

Completed (as specified in 4/10/79 report).

7

'b'hdh d.

Training of Plant Personnel (Items 1, 4,11 and plant / procedures changes):

All but one licensed operator have completed licensee's training

,29 I$.

'qq,)

Q 7 90702 06NO T

bf/R R

I TI 2595/2 Page 2 of 2 2.

SUPP.ARY OF NRC INSPECTION ACTIVITY DURING PERIOD 4/18/79 (Address Items 1.a. thru 2.d. above, plus other independent /significant effort, identify shifts on which activity was done during past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />):

Inspection coverage from 6:00 Ari to 6:30 PM - Conducted control room surveillance; with SMUD management, accompanied Congressman Shumway on tour of plant; reviewed procedures issued pursuant to IEB 79-05A.

Con-tinued review of changes made to containment isolation valves.

3.

STATUS OF INSPECTOR DISCUSSIONS WITH PLANT PERSONNEL:

Completed.

Discussions with the last two licensed operators conducted 4/18/79.

4.

DESCRIPTION OF GENERAL PLANT STATUS (i.e., operating power level, planned changes, scheduled outages, ESF out of service, major maintenance, reportable occurences, etc.)

100% power, no known problems, no significant surveillance scheduled, no j

ESF Systems out of service; a one-day outage is scheduled for 5/12/79 l

(see 4/18/79 report).

f t

Sumary of TI 2595/2 items complete to date:

III.A - Complete III.B - Complete except for (1) operator.

III.C - Complete except for the one possible discrepancy noted in Paragraph 2 above.

III.D - Complete V - Complete mt l$f b

5

.