Text
SWEPCO Tube Corporation Docket No. 99900026/79-01 Notice of Deviations Based on the results of an NRC inspection conducted on April 24-27, 1979, it appears that certain of your activities were not conducted in full accordance with NRC requirements as indicated below:
Criterion V of Appendix B to 10 CFR 50 requires that activities affecting quality shall be prescribed by documented procedures and shall be accom-plished in accordance with these procedures.
A.
The QA Manual, Section 5, paragraph " System of Production Checks,"
states in part, "The machine settings and all pertinent data are.
in accordance with the welding procedure."
Contrary to the above, the welding performed in the manufacture of SA-312, T-304, ASME Code Class 1 and 2 piping was not accomplished in accordance with welding procedure specification (WPS) H-304-HN, Revi-sion 4, as required by the job order travelers, for the following orders:
Weldir.g Procedure Specification H-304-HN, Revision 4 Amps Range 160-220 Shielding Gas Flow, CFH 40 (Both Torches)
Travel Speed, IPM 8-9 Job No. M-3225-8 Top Torch Bottom Torch Amps Used 250 260 Job No. M-3536-9 Amps Used 280 275 Shielding Gas Flow, CFH 60 60 Travel Speed, IPM 4