p JUL 1719D MEMORANDUM FOR:
D. Eisenhut, Acting Director, Division of Operating Reactors THRU:
B. Grines, Assistant Director for Systems and Engineering, Division of Operating Reactors D
FROM:
G. Lainas, Chief, Plant Systems Branch, Division of Operating Reactoro
SUBJECT:
RESOURCE NEEDS TO COMPLETE GENERIC ISSUES TASK B-07, STEAM GENERATOR FEEDWATER FLOW INSTABILITY As of this date there are 23 dockets, listed in Table 1, which have not had steam generator feedwater flow instability evaluations issued. As currently planned, EG&G would provide 20 of these evaluations; J. Reece, our consultant, would evaluate Robinson 2; and S. MacKay would evaluate the remaining three plants (Calvert Cliffs 1 and 2 and Fort Calhoun).
At our present rate of progress, we would not complete all of these evaluations until Maren 1980.
After discussions with my staff, EG&G and project people, I conclude that to conduct the level of review currently being performed and complete this effort by the end of December 1979, the following would be needed:
1.
An additional $57K for EG&G to fund 4 persons through November.
2.' A comitment from our consultant J. Reece, that he would be completed with Robinson 2 by the first of September 1979.
3.
An additional staff memoer withfn NRR 1/2 time in July and full time August through Decenter to assist S. MacKay in managing the EG&G reviews and Reece's review.
Y. Huang, PSB can be reassigned ta assist S. MacKay. This will result in a six month delay in Appendix J reviews and ACAD system reviews.
4.
An ideal situation with respect to all remaining licensees to avoid delaying problems such as have occurred on:
a.
Indian Point 2 - PSB completed
n January 1979. ORB Branch Chief did noc wish to issue until the structural integrity of the piping was addressed. Recently issued July 1979.
,y
,n-m; 790803045'l
<w
..~
._-e
~, - -
\\
a 2 -
b.
Salem 1 - PSB completed in January 1979. The licensee perceives some conflict between his license restriction C.(3) " Steam Generator Water Rise Rate" and statements concerning auxiliary feedwate" flow rate presented in our evaluation. The ORPM has not had an opportunity to resolve this due to involvement in hearings and job reassignments.
c.
Zion 1 and 2 - PSB position prepared for issuance to ORB 5/79 but conversationswith the licensee were suggested to address our di fferences. The licensee had taken a position late May that they did not need "J" tubes but now has agreed to install them on all 7 remaining sceam generators at the rata of one steam generator during each refueling outage in light of his waterhammer experience of June 8.
5.
There are 4 people available at EG&G, and they can becore product 4.-
almost instantly. We understand that Byron Hansen is working,
time on these reviews at EG&G and, if he were relieved of resp...sibilities under FIN A6167, could be made available immediately full time. We also understand that Mark Hanner, EG&G: who is working on reviewing Standard Review Plans under FIN A6;is, is also knowledgeable and could ha made available full time if NRC realigned its priorities.
6.
- 5. MacKay is not requested to commit time on any activity other than tie 3 weeks requested on A-10 and those 3 weeks will be made as aflable at PSB's discretion to reduce the impact on the feedwater flow instability reviews.
This 'arge resource requirement is necessary because these reviews encom ass a great deal of what the licensees should have done in response to ou requests in May 1975 and September 1977. /
iditional request to th! licensees at this time would certainly not resuit in completion of tF is task by 12/31/79. A number of the above conditions may also be difficult to attain.
For example, it may not be possible to have Hansen and Henner reassigned to this effort at EG&G as Hanner is working on TAP A-1 a.'d EG&G has no one else available.
However, these resources should produce a completed PSB review by December, and the ORPM's should be able te issue a montn later.
There is an associated problem currently delaying the issuance of the Salem i evaluation as discussed above, which nay arise on 4 other dockets. We estimate it would take about 3 man-months to remove the license conditions n 4 }.
9 u. ;
c.
.w
.,y e.
++m4-
. ed coordinate with improved auxiliary feedwater designs resulting from TMI. However, we do not believe this to be a part of the SG feedwater flow instability problem, and it should be addressed at a later dats. Wi thout a management decision to treat it this way, we may have a difficult time convincing projects.
(-
$ ' b M, G. Lainas, Chieff Plant ~ si.ams Branch Division of Operating Reactors
Contact:
E. Adensam, X27110
Enclosure:
As stated cc w'9nclosure:
B. Grimes W. Gammill R. Vollmer G. Lainas A. Schwencer D. Ziemann R. Reid T. Ippolito V. Panciera e
S. MacKay E. Adensam J. Huang U
)
ij rn?
7 o 7-we
>e.
--e-e
ew
s TABLE 1 STEAM GENERATOR FEEDWATER FLOW INSTABILITY DOCKETS NOT YET ISSUED AN EVALUATION Contractor
- Scheduled PSB Ccmpletion Completion Docket Name To meet 12/79 To meet 12/79 Conn. Yankee 9/79 10/79 Ginna 9/79 10/79 Kewaunee 6/79C 7/79 Point Beach 1 6/79C 7/79 Point Beach 2 6/79C 7/79 Prairie Island 1 7/79 7/79 Prairie Island 2 7/79 7/79 Salem i ll/78C 1/79C San Onofre 9/79 10/79 Trojan 9/79 10/79 Turkey Point 3 9/79 10/79 Turkey Point 4 9/79 10/79 Yankee Rowe 10/79 11/79 Zion 1 4/79C 8/79 Zion '
4/79C 8/79 Calvert Cliffs 1 11/79 Calvert Cliffs 2 11/79 Fort Calhoun 11/79 Maine Yankee 11/79 12/79 Millstone 2 11/79 12/79 Palisades 11/79 12/79 St. Lucie 1 10/79 11/79 Robinson 2
?
4 "C" indicates completed
- Assuming 4 people at EG&G assigned in Juij.