Forwards IE Info Notice 79-18, Skylab Reentry. No Action Required
ML19247A487
Person / Time
Site: 05000192
Issue date: 07/06/1979
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gloyna E
TEXAS, UNIV. OF, AUSTIN, TX
References
NUDOCS 7908010020
Download: ML19247A487 (1)


Text

g @ R f Cug f-q'o UNITED STATES CEflTRAL FILES E h,,,

NUCLEAR REGULATORY COMMISSION MQ a.;.lE O kgj/ j c

REGION IV o, G 2 L E / J TIC 611 RYAN PL AZA CRIVE, SUITE 1000

'2

[

((${C ARLINGTON, TEXAS 76012

....+

July 6, 1979 In Reply Refer To:

Docket No. 50-192 The University of Texas ATTN:

Dr. E. F. Cloyna, Dean College of Engineering Austin, Texas 787.'.2 Centlemen:

This IE Information Not-ice is provided as an early notification of a possibly significant natter.

It is expected that recipients vill review the information for possible applicability to their facilities.

No specific action or response is requested at this tine.

If you have questions regarding this catter, please contact the Director of the appropriate NRC Regional Office.

fi'~

Karl V. Seyfrit Director

Enclosures:

1.

IE Information Notice No. 70 18 2.

List of IE Information Notice Issued in 1979 Db

'4"l is

/

7 00801002Q4

UNITED STATES NUCLEAR REGULATORY CO:f!ISSION OFFICE OF INSPECTION A'iD ENFORCEMENT WASHINGTON, D.C.

20555 IE Information Notice No. 79-18 Date:

July 6, 1979 Page 1 of 1 3KYLAB PEENTRY Description of Circumstances:

The most recent dates for reentry of Skylan a e July 10 to 14, 1979, with July 12, as the most probable date. Recognizing that a hit on a nuclear reactor would be highly unlikely by Skylab debris, the NRC believes it would be prudent for licensees to review their contingency plans in case such an event should actually occur.

The NRC is in commur.ication with the Department of Energy (DGE), and will receive notification from thea as soon as the reentry corridor can be established. This notification may occur within 1 to 2 hcurs before reentry actually occurs.

If it is determined that there are any licensed nuclear power plants in the reentry corrido, tE; plants will receive notification from their respective Regicial Office via the dedicated phone line.

This Information Notice is provided as an early cotification of a possibly significant matter.

It is expected that rs. 1pients will review the informa-tion for possible applicability to their facilities.

No specific action or response is requested at this time.

If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to reccmmend or request specific licnesee actions.

If you nave questions regarding the matter, please contact the Director of the appr:priate NRC Regional Of fice.

No written response to this iclormation notice is required.

O 'f i

c 4" '_\\U cl l

7907120387

IE Information Notice No. 79-18 July 6, 1979 LISTING OF IE INFOR}L\\ TION NOTICES ISSL'ED IN 1979 Info rma tion Subject Date Issued To Notice No.

Issued 79-01 Bergen-Paterson Hydraulic 2/2/79 All power reactor Shock and Sway Arrestor facilities with an Operating License (OL) or a Construc-tion Permit (CP) 79-02 Attempted Extortion -

2/2/79 All Fuel Facilities Lcw Enriched Uranium 79-03 Limitorque Valve Geared 2/9/79 All power reactor Limit Switch Lubricant facilities with an Operating License (OL) or a Construc-tion Permit (CP) 79-04 Degradation of Engineered 2/16/79 All power reactor Safety Features facilities with an Operating License (OL) or a Construc-tion Permit (CP) 79-05 Use of Improper ?!aterials 3/21/79 All power reactor In Safety-Related Components facilities with an Operating License (CL) or a Construc-tica Permit (CP) 79-C6 Stress Analysis of 3/23/79 All Holders of an Safety-F.clated Piping Reactor Cperating License (CL) or a Ccastruction Pe rmit (CP) 79-07 Rupture of Radwaste 3/26/79 All power reactor Tanks facilities with an Operating License (OL) or a Construc-tion Pe rmit (CP)

Enclosure Page 1 of 2 I(he h

a IE Information Notice No. 79-18 July 6, 1979 79-08 Interconnection of 3/28/79 All power reactor Contaminated Systems witn facilities with an Service Air Systems Used Operating License As the Source of Breathing (OL) and Pu Proces-Air sing fuel facilities 79-09 Spill of Radioactively 3/30/79 All power reactor Contaminated Resia facilities with an Operating License (OL) 79-10 Ncnconforming Pipe 4/16/79 All power reactor Support Struts facilities with a Construction Permit (CP) 79-11 Lower Reactor Vessel Head 5/7/79 All Holders of Reactor Insulatica Support Problem Operating Licenses (OLs)

Construction Permits (cps) 79-12 Attempted Damage to New 5/11/79 All fuel facilities, Fuel Assemblies research reactors, and power reactors with an Operating Licensee (OL) or a Constructica Permit (CP) 79-13 Indication of Low Water 5/29/79 All Holders of Operating Level in the Oyster Creek License (OL) or Reactor Construction Permit (CP) 79-14 NRC Position of Electrical 6/11/79 All Fower Reactor Cable Support Systems facilities with a Construction Permit (CP) and applicants 73-15 Deficient Procedures 6/7/79 All Holders of Reactor Cperating Licenses (OLs) and Construction Permits (cps) 79-16 Nuclear Incident at Three 6/22/79 All P.esearch Reactors Mile Island and Test Reactors with Operating Licenses (OLs) 79-17 Source Holder Assembly 6/20/79 All Holders of Reactor Damage From Misfit Between Operating Licenses (OLs)

Assembly and Reactor Upper and Construction Grid Plate Permits (cps)

Enclosure Page2of2/02 1 '~! 9