Text
w M L FILES M :HQ pa anc ot<'o g
UNITED STATES TIC fh NUCLEAR REGULATORY COMMISSION NSIC
. 2 c;y,cf. g/ j
$.gMg;A/ J y
REGION IV
$ "fm/.
G11 RY A*4 PLAZ A oCIV E, SutTE 1000
's 'O4[
ARLING TO'J, TE.* AS 7631 July 6, 1979 In Reply Refer To:
Docket No. 50-143 University of Kansas ATTN:
Dr. Daid Kraf t, Dean School of Engineering Lawrence, Kansas 66044 Gentlemen:
This IE Infor ation Notice is provided as an early notification of a possibly significant catter.
It is expected that recipients will review the infor ation for possible applicatility to their facilities. No specific action or respcase is requested at this time.
If you have questions regarding this catter, please contact the Director of the appropriate :;RC Regional Office.
/
/
h'
~
TU ffh{ t t-Tarl V.
Seyfri
/
Director Enc '.o sure c :
1.
IE Infor:ation Notice No. 79-18 2.
List of IE Information Notice Issued in 1979 3,!;
4 [.
n, f
U c.
)
7008010 O(7
UNITED STATES NUCLEAR REGULATORY C0101ISSION OFFICE OF INcPECTION AND ESTORCEMENT WASHINGTON, D.C.
20555 IE Information Notice No. 79-18 Date: July 6, 1979 Pagt 1 of 1 SKYLAB REESTRY Descriptica of Circumstances:
The most recent dates for reentry of Skylab are July 10 to 14, 1979, with July 12, as the cost probable date.
Recognizing that a hit on a nuclear reactor would be highly unlikely by Skylab debris, the NRC believes it would be prudent for licensees to review their contingency plans in case such an event thould actually occur.
The NRC is in ccrmunication with the Department of Energy (DCE), and will receive notification from them as soon as the recatry corridor can be established. This notification may occur within i to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> before reentry actually occurs.
If it is determined that there are any licensed nuclear power plants in the reentry corridor, tb plants will receive notification frca their respective Regional Offi a via the dedicated phone line.
This Information Notice is provided as an early notification of a possibl" significant matter.
It is expected that recipients will review the informa-tion for possible applicability to their facilities.
No specific action or response is requested at this time.
If further NRC evaluation; so indicate, an IE Circular or Bulletin will be issued to reccmmend or request specific licnesee actions.
If you have questions regarding the matter, please ccatact the Di ector of the appropriate NRC Recicnal Of fice.
No written response to this information notice ic required.
9 O
b' ^)
{d}
79071g93g7
IE Information Notice No. 79-18 July 6, 19i9 LISTING OF IE IN70R'!ATION NOTICES ISSCED IN 1979 Information Subject Date Issued To Notice No.
Issued 79-01 Bergen-Paterson Hydraulic 2/2/79 All power reactor Shock and Sway Arrestor facilities with an Operating License (OL) or a Construc-tion Permit (CP) 79-02 Attempted Extortion -
2/2/79 All Fuel Facilities Low Enriched braniun 79-03 Limitorque Valve Geared 2/9/79 All power reactor Limit Switch Lubricant facilities with an Operating License (OL) or a Construc-tion Permit (CP) 79-04 Degradation of Engineered 2/16/79 All power reactor Safety Features facilities with an Operating License (OL) or a Construc-tion Permit (CP) 79-05 Use of Improper Materials 3/21/79 All power reactor In Safety-Related Components facilities with an 0-' rating License or a Construc-tron Permit (CP) 79-06 Stress Analysis of 3/23/79 All Holders of an Safety-Related Piping Reactor Operating License (OL) or a Construction Pe rmit (CP) 79-07 Rupture of Radwaste 3/26/79 all power reactor Tanks facilities with an Operating License (OL) or a Construc-tica Permit (CP)
Ecclosure Page 1 of 2 kN,g q'g\\
L' u
IE Information Notice No. 79-1S July 6, 1979 79-08 Incerconnection of 3/28/79 All power reactor Contaminated Systems with facilities with an Service Air Systems Used Operating License As the Source of Breathing (OL) and Pu Proces-Air sing fuel facilities 79-09 Spill of Radioactively 3/30/79 All power reactor Contaminated Resin facilities with an Operating License (OL) 72-10 Nonconforming Pipe 4/16/79 All power react <r Support Struts facilities with a Construction Permit (CP) 79-11 Lower Reactor 'essel Head 5/7/79 All Holders of Reactor Insulation Support Problem Operating Licenses (OLs)
Construction Permits (cps) 79-12 Attempted Damage to New 5/11/79 All fuel facilities, Fuel Assemblies research reacters, and power reactors with an Operating Licensee (0L) or a Construction Permit (CP) 79-13 Indication of Low Water 5/29/79 All Holders of Operating Level in the Oyster Creek License (OL) or Reactor Construction Permit (CP) 79-14 NRC Position of Electrical 6/11/79 All Power Reactor Cable Support Systems facilities with a Construction Permit (CP) and applicants 79-15 Deficient Procedures 6/7/79 All Holders of Reactor Operating Licenses (OLs) and Construction Pe rmits (cps) 79-16 Nuclear Incident at Three 6/22/79 All Research Reactors Mile Island and Test Reactors with Operating Licenses (OLs) 79-17 Source Holder Assembly 6/20/79 All Holders of Reactor Damage Frem Misfit Between Operating Licenses (0Ls)
Assembly and Reactor Upper anc Construction Grid Plate Permits (cps)
Enclosure Page 2 of 2