ML19247A481
| ML19247A481 | |
| Person / Time | |
|---|---|
| Site: | Kansas State University |
| Issue date: | 07/06/1979 |
| From: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Faw R KANSAS STATE UNIV., MANHATTAN, KS |
| References | |
| NUDOCS 7908010012 | |
| Download: ML19247A481 (1) | |
Text
_
[g in A R I C ry CEtlTRAL FILES g
UNITED STATES
$.,' h 7)e 3' )I NUCLE AR REGULATORY COMMISSION Md
. # 'e s
TIC ll.
REGION IV o, (.N kN / [
611 RY AN PL A ?A DRIVE, SUITE 14 0 iib [C
- d
+.... a[
h AR Ll?.GTON, TE X AS 76012 o
July 6, 1979 In Reply Refer To:
Docket No. 50-183 Kansas State University Department of :;uclear Engineering ATT:. :
Dr.
R. E. Fa.3, Director Suclear Reactor Facility Manhattan, ransas 66502 Centlemen:
This IE Information Notice is provided as an early notification of a possibly significant matter.
It is expected that recipients will review the information for possible applicability to their facilities.
No specific action or response is requested at this time.
If you have questions regarding this tatter, please contact the Director of the appropriate NRC Regional Office.
7(
f
/
Karl V. Seyfri Director
Enclosures:
1.
IE Infonation Notice No. 79-13 2.
List of IE Infor=ation Motice Issued in 1979
,noa Y,7
~
u 7 908G 10 0ll
.h UNITED STATES NUCLEAR REGl'LATORY CCT21ISSION OFFICE OF INSPECTION MD ENFORCE.'ENT WASHINGTON, D.C.
20555 IE Information Notice No. 79-18 Date:
July 6, 1979 Page 1 of I SKYLAB REE.NTRY Cescription of Circumstances:
The most recent dates for reentry of Skylab are July 10 to 14, 1979, with July 12, as the most probable date.
Recognizing that a hit on a nuclear reactor would be highly unlikely by Skylab debris, the NRC believes it would he prudent for licensees to review their contingency plans ;a case such an event should actually occur.
The NRC is in communication with the Department of Energy (DOE), and will receive notification from them as soon as the reentry corridor can be established.
This notification may occur within 1 to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> before reentry actually occurs.
If it is determined that there are any licansed nuclear power plants in the reentry corridor, the plants will receive notification from their respective Regional Office via the dedicated phone line.
This Information Notice is provided as an early notification of a possibly significant matter.
It is expected that recipients will review the inf0rma-tion for possible applicability to their facilities.
No specific action or response is requested at this time.
If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request s p e c.i fi t licnesee actions.
If you have questions regarding the matter, please contact the Director of the appropriate SRC Regional Office.
No written response to this infccmatica notice is required.
^'@
L' 40_L 7907120387
IE Information Notice No. 79-18 July 6, 1979 LISTING OF JE INFORMATION NOTICES ISSUED IN 1979 In f o rna t io n Subject Date Issued To Notice No.
Issued 79-0.
Bergen-Paterson Hydraulic 2/2/79 All pcwer reactor Shock and Sway Arrestor facilities with an Operating License (OL) or a Construc-tion Permit (CP) 79-02 Attempted Extortion -
2/2/79 All Fuel Facilities Low Enriched Uranium 79-03 Limitorque Valve Geared 2/9/79 All power reactor Limit Switch Lubricant facilities with an Operating License (OL) or a Construc-tion Permit (CP) 79-04 Degradation of Engineered 2/16/79 All pcwer reactor Safety Features facilities with an Operating License (OL) or a Construc-tion Permit (CP) 79-05 Use of Improper Materials 3/21/79 All power reactor In Safety-Related Components facilities with an Operating License (OL) or a Con:truc-tion Permit (CP) 79-06 Stress Analysis of 3/23/<3
.\\ll Holders of an Safety-Related Piping Feactor Operating License (CE) er a C astructica Pe rmit (C?)
79-07 Rupture of Radwaste 3/26/79 All power reactor Tanks facilities with an Operating Licence (OL) or a Construt-ticu Permit (CP)
Enclosure Page 1 of 2 4 0 'J.
2.59
IE Information ?!otice No. 79-18 July 6, 1979 79-OS Interconnection of 3/2S/79 All power reactor Contaminated Systems with facilities with an Service Air Systems Used Operating License As the Scurce of Sreathing (CL) and Pu Proces-Air sing fuel facilities 79-09 Spill of Radioactively 3/30/79 All power reactor Contaminated Resin facilities with an Operating License (OL) 79-10 Nonconforming Pipe 4/16/79 All power reactor Support Struts facilities with a Construction Pe rmi t (CP) 79-11 Lcwer Reactor Vessel Head 5/7/79 All Holders of Reactor Insulation Support Problem Cperating Licenses (OLs)
Construction Permits (cps) 79-12 Attempted Damage to New 5/11/79 All fuel facilities, Fuel Assemblies research reactors, and power reactors with an Operating Licensee (OL) or a Construction Permit (CP) 79-13 Indication of Low Water 5/29/79 All Holders of Operating Level in the Oyster Creek License (OL) or Reactor Construction Permit (CP) 79-14 NRC Position of L_ectrical 6/11/79 All Pcwer Reactor Cable Support Systems facilities with a Constructica Permit ( P) and applicants 79-13 Deftcient Precedures 6/7/79 All Holders of Reactor Operating Licenses (OLs) and Ccastruction Permits (cps) 79 16 Nuclear Incident at Three 6/22/79 All Research Reactors Mile Island and Test Reactors with Operating Licenses (OLs) 79-17 Source Holder Assembly 6/20/79 All Holders of Reactor Daaage Frcm Misfit Between Operating Licenses (OLs)
Assembly and Reactor Upper and Construction Grid Plate Permits (cps)
Enclosure cabge2of2
,,,P 4U-