ML19247A480
| ML19247A480 | |
| Person / Time | |
|---|---|
| Site: | Idaho State University |
| Issue date: | 07/06/1979 |
| From: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Coulter B IDAHO STATE UNIV., POCATELLO, ID |
| References | |
| NUDOCS 7908010010 | |
| Download: ML19247A480 (1) | |
Text
_..
>= Ncp CENTRAL FILES 4
'o UNf TED STATES E T'$ o.
N'k NUCLEAR REGULATORY COMMISSION N
- 6-i o
% fTO'J. [
611 RYAN PLAZA o AIVE, SUITE 1000
'C REGION IV S h hyd[/
%, ' ' ~ ~'
AR LINGTON, TEXAS 76012 July 6, 1979 In Reply Refe To:
Docket No. 50-234 Idaho State University AITI:
Dr. Syron Coulter, President Pocattello, Idaho 83201 Centleceu:
This IE Infor=ation Notice is previded as an early notification of a possibly significant matter.
It
'.s expected that recipients vill review the infornation for possible applicability to their facilities. No specific action or response is requested at this time.
If you have questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.
O
/d
']
[Karl V. Seyfrit U}
'%G f.'
Director
Enclosures:
1.
IE Information Notice No. 79-18 2.
List of IE Information Notice Issued in 1979 402 2M 7908010 0(O
~
UNITED STATES N1' CLEAR REGUI.ATORY COS.ISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 IE Information Notice No. 79-18 Date:
July 6,1979 Page 1 of I SKTLAB REENTRY Descriptica of Circumstances:
The most recent dates for reentry of Skylab are July 10 to 14,1979, with July 12, as the most probable date.
Recognizing that a hit on a nuclear reactor would be highly unlikely by Skylab debris, the NRC believes it would be prudent for licensees to review their contingency plans in case such an event should actually occur.
The NRC is in communication with the Department of Energy (DOE), and will receive notification from them as soon as the reentry corridor can be establish (d.
This notification may c cur within 1 to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> before reentry actually occurs.
If it is det :rmined that there are any licensed nuclear power plants in the reentry corridor, the plants will receive notification from their. respective Regional Of fice via the dedicated phone line.
This Information Notice is provided as an early notification of a possibly significant matter.
It is expected that recipients will review the informa-tion for possible applicability to their facilities. No specific action or response is requested at this time.
If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licnesee actions.
If you have questions regarding the matter, please contact the Director of the appropriate NRC Regional Of fice.
No written response to this information notice is required.
40.-z
- 2. 2 s
7907120387
IE Information Notice No. 79-18 July 6, 1979 LISTING OF IE INFORMATION NOTICES ISSUED IN 1979 Information Subject Date Issued To Notice No.
Issued 79-01 Bergen-Faterson Hydraulic 2/2/79 All power reactor Shock and Sway Arrestor facilities with an Operating License (OL) or a Construc-tion Permit (CP) 79-02 Attempted Extortion -
2/2/79 All Fuel Facilities Low Enriched Uranium 79-03 Limitorque Valve Geared 2/9/79 All power reactor Limit Switch Lubricant facilities with an Operating License (OL) or a Construc-tian Permit (CP) 79-04 Degradat on of Engineered 2/16/ ~/ 9 All power reactor Safety features faciliiies witn an Operat ng License (0L) c r a Construc-tion Fermit (CP) 79-05 Use of Improper Materials 3/21/79 All poier reactor In Safety-Related Components facilities with an Operating License (OL) or a Construc-tion Permit (CP) 79-06 Stress Acalysis of 3/23/79 All Holders of an Safety-Related Piping Reacter Operating License (OL) or a Constructica Pe rmit (CP) 79-07 Ruptur of Radwaste 3/26/79 All power reactor Tanks facilities with an Operating License (OL) or a Construc-tion Permit (CP)
Encicsute Page 1 of 2 2, J 4()'u)
IE Information Notice No. 79-1F July 6, 1979 79-08 Intercoanection of 3/28/79 All power reactor Contacinated Systems with facilities with an Service Air Systems Used Operating License As the Source of Breathing (OL) and Pu Proces-Air sing fuel facilities 79-09 Spill of Radioactively 3/30/79 All power reactor Contaminated Resia facilities with an Operating License (OL) 79-10 Nonconforming Pipe 4/16/79 All power reactor Support Struts facilities with a Construction Pe rmit (CP) 79-11 Lower Reactor Vessel Head 5/7/79 All Ha'ders of Reactor Insulat a Support Problem Operating Licenses (OLs)
Construction Permits (cps) 79-12 Attempted Damage to New 5/11/79 All fuel facilities, Puel Assemblies research reactors, and power reactors with an Operating Licensee (OL) or a Construction Permit (CP) 79-13 Indicaticn of Low Water 5/29/79 All Holders of Operating Level in the Oyster Creek License (OL) or Reactor Construction Permit (CP) 79-14 NRC Position of Electrical 6/11/79 All Power Reactor Cable Support Systems facilities with a Construction Pe rmit (CP) and applicants 79-15 Deficient Procedures 6/7/79 All Holders of Reactor Operating Licenses (OLs) and Construction Permits (cps) 79-16 Nuclear Incident at Three 6/22/79 All Research Reactors Mile Island and Test Reactors with Operating Licenses (OLs) 79-17 Source Holder Assembly 6/20/79 All Holders of Reactor Damage Frca Misfit Between Operating Licenses (OLs)
Assembly anc Reactor Upper and Ccnstruction Grid Plate Permits (cps)
Enclosure
'L)g Page 2 of 2 r
, \\) /\\'
i
_ _. _ _