ML19247A478
| ML19247A478 | |
| Person / Time | |
|---|---|
| Site: | 05000262 |
| Issue date: | 07/06/1979 |
| From: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Mcclurg L Brigham Young University, PROVO, UT |
| References | |
| NUDOCS 7908010008 | |
| Download: ML19247A478 (1) | |
Text
-.
s
- ,c.# *%,
CENTRAL FILES f,
UNITED STATES M.HQ g '[3, v. $,g NUCLEAR REGULATORY COMMISSION TIC CW. c REGION IV q3{g
,v t,KQL,1[#
's, j
611 RYAN PL AZA DRIVE, SUITE 1000 ARLINGTON. TEX As 76012 July 6, 1979 In Reply Refer To:
Docket No. 50-262 Brigham Young University ATT'i:
Dr. Lynn McClurg Assistant to the Dean College of Physical and Mathematical Science Provo, Utah 84602 Gentle =en:
This IE Infor ation Notice is provided as an early nr ification of a possibly significant catter.
It is e:cpected that r.;ipients will review the infornation for possible applicability to theli facilities.
No specific action or response is requested at this tice.
If you have questiens regarding this catter, please contact the Director of the appropriate NRC Regional Office.
/C4 d.
~
li.
s.:
/ ',
Karl V. Seyfrit /
Director
Enclosures:
1.
IE Information Notice No. 79-13 2.
List of II Infornati a Notice Issued in 1979 3
!1 t
't 908010 00 S
o UNITED STATES NUCLEAR REGULATORY COBD!ISSION OFFICE OF INSPECTION AND ENFORCE >ENT WASHINGTON, D.C.
20555 IE Information Notice No. 79-18 Date:
July 6, 1979 Page 1 of 1 SKYLAB REENTRY Description of Circumstances:
The most recent dates for reentry of Skylab are July 10 to 14, 1979, with July 12, as the most probable date.
Recognizing that a hit on a nuclear reactor would be highly unlikely by Skylab debris, the NRC believes it would be prudent for licensees to review their contingency plans in case such an event should actually occur.
The NRC is in communication with the Department of Energy (DOE), and will receive notification from them as soon as the reentry corridor can be established. This notification may occur within 1 to 2 ho"rs before reentry actually occurs.
If it is determined that there are any licensed nuclear powe; plants in the reentry corridor, the plants will receive notification from their respective Regional Office via the dedicated phone line.
This Information Notice is provided as an early notification of a possibly significant matter.
It is expected that recipients will review the in f o rma-tion tor possible applicability to their facilities.
No specific action or response is requested at this time.
If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licnesee actions.
If you have questicas regarding the matter, please contact the Director of the appropriate NRC Regional Office.
No written response to this informatten notice is required.
k02 7907120387
IE Information Notice No. 79-18 July 6, 1979 LISTING UF IE INFOR'1ATION NOTICES ISSL'ED IN 1979 Information Subject Date Issued To Notice No.
Issued 79-01 Bergen-Paterson Hydraulic 2/2/79 All power reactor Shock and Sway Arrestor facilities with an Operating License (OL) or a Construc-tion Permit (CP) 79-02 Attempted Extortion -
2/2/79
'll Fuel Facilities Low Eariched Uranium 79-03 Limitorque Valve Geared 2/9/79 All power reactor Li=it Switch Lu'oricant facilities with an Operating License (OL) or a Construc-tion Permit (CP) 79-C-Degradation of Engineered 2/16/79 All power reactor Saiety Features facilities with an Operating License (OL) or a Construc-tion Permit (CP) 79-05 Use of Improper Materials 3/21/79 All power reactor In Safety-Related Cceponents facilities with an Operating License (OL) or a Construc-tion Permit (CP) 79-Cd stress inalysis cf 3/23/79 All Holders of an Safet;-Related Piping Reactor Coerating License (OL) or a Cocstruction Pe rmit (CP) 79-)7 Rupture of Radwr.ste 3 / 26,' PJ All power reactor Tarks facilities with an Operating License (0L) or a Construc-tica Permit (CP)
Enclosure Page 1 of 2 7'}
n
IE Information Notice No. 79-18 July 6, 1979 79-CS Interconnectica of 3/28/79 All powec reactor Contaminated Systems with facilitiec with an Service Air Systems Used Operating 'icense As the Source of Breathing (OL) and Pu Proces-Air sing fuel f2cilities 79-09 Spill of Radioactively 3/30/79 All power reictor Contaminated Resin facilities w.th an Operating License (OL) 79-10 Nonconforming Pipe 4/16/79 All power reactor Support Struts facilities with a Construction Permit (CP) 79-11 Lower Reactor Vessel Head 5/7/79 All Holders of Reactor Insulation Support Problem Operating Licenses (OLs)
Construction Permits (cps) 79-12 Attempted Damage to New 5/11/79 All "uel facilities, Fuel Assemblies research reactors, and power reactors with an Operating Licensee (OL) or a Construction Permit (CP) 79-13 Indication of Low Water 5/29/79 All Holders of Operating Level in the Oyster Creek License (OL) or Reactor Construction Permit (CP) 79-14 NRC Position of Electrical 6/11/79 All Power Reactor Cable Support Systems facilities with a Constructirn Permit (CP) and applicants 79-15 Deficient Procedures 6/7/79 All Holders of Reactor Operating Licenses (0Ls) and Constructic.a Permits (cps) 79-16 Nuclear Incident at Three 6/22/79 All Research Reactors Mile Island and Test Reactors with Operating Licenses (GLs) 79-17 Source Holder Assembly 6/20/79 All Holders of Peactor Damage From '!isfit Between Operating Licenses (OLs)
Assembly and Peactor Upper and Construction Grid Plate Permits (cps)
Enclosure
- -)
g Page 2 of 2 V
.s R,
s
- _ _ _