ML19247A370
| ML19247A370 | |
| Person / Time | |
|---|---|
| Site: | 05000394 |
| Issue date: | 07/06/1979 |
| From: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Gordon R CALIFORNIA POLYTECHNIC STATE UNIV., SAN LUIS OBISPO |
| References | |
| NUDOCS 7907310166 | |
| Download: ML19247A370 (1) | |
Text
!pH 8'E Cg'c>
UtJITED STATES E \\*
gt(','o NUCLE AR REGi)LATORY COMMISSION
'C
. $3,,,CV/ E accion v
/
4
.5
[
1930 N. C Alif 0HNI A P.OUL EVARD
'N+
cf SUIT E 202, WALNUT CRE E K PL AZA V. ALNUT CD.E E K, CALIFORNI A 94S06 July 6,1979 Docket flo. 50-394 California Poly. State University San Luis Obispo, California 93401 Attention:
R. G. Gordon, Department Head Mechanical Engineering Deprtment Gentlemen:
This Information Notice is provided as an early notificatior, of a possibi <
significant matter.
It is expected that recipients will,clic: th. informa-tion for possible applicability to their facilities.
fio specific action or response is requested at this time.
If you have questions regarding this matter, please contact the Director of the appropriate llRC Regional Office.
Sincerely,
.. q..,
}Ll4 / z c ( S. ~ _
R. H. Engelken Director Enc'iosure:
IE Information flotice No. 79-18 Nb
]2/
c
//
( // )
? 00 7310lg
UNITED STATES flVCLEAR REGULATORY COMMISSIOt 0FFICE OF IflSPECTI0!l AND E!lFORCEttEtlT WASHIfiGTON, D.C.
20555 July 6, 1979 IE Information flotice flo. 79-18 SKYLAB REENTRY Descripticn of Circt.mstances:
The most recent dates for reentry of Skylab are July 10 to 14, 1979, with July 12, as the post probable date.
Recognizing that a hit on a nuclear power plant would be highly unli'<ely by Skylab debris, the flRC believes it would be prudent for licensees to review their contingency plans in casa such an event should actuM 1y occur.
The fiRC is in communication witn the Department of Energy (DOE), and will receive nolification from them as soon as the reentry corridor can be established.
This notification may occur within 1 to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> befort reentry actually occurs.
If it is determined that there are any licensed nuclear power plants in the reentry corridor, the plants will receive notification from their respective Regional Office via the dedicated phone line.
This Information flotice is provided as an early notification of a possibly significant tratter.
It is expected that recipients will review the inforna-tion for possible applicability to their facilities.
flo specific action or response is r? quested at this time.
If further flRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licnesee actions.
If you have questions regarding the matter, please contact the Director of the appropriate f1RC P,egional Office.
flo written response to this information notice is required.
Enclosure:
List of IE Information flotices Issued in 1979 426 328 19ewow7
IE Information flotice flo. 79-18 Enclosure July 6, 1979 Page 1 of 2 LISTIf1G OF IE IfiFORiiATION fiOTICES ISSUED Ill 1979 Information Subject Date Issued To f;otice fio.
Issued 79-01 Bergen-Paterson Hydraulic 2/2/79 All power reactor Shock and Sway Arrestor facilities with an OL or a CP 79-02 Attempted Extortion -
2/2/79 All Fuel Facilities Low Enriched Uranium 79-03 Linitorque Valve Geared 2/9/79 All power reactor Linit Switch Lubricant facilities with an OL or a CP 79-04 Deg adation of 2/16/79 All power reactor Engineered facilities with an Safety Features OL or a CP 79-05 Use of Improper !!aterials 3/21/79 All power reactor in Safety-Related Components facilities with an OL or CP 79-06 Stress Analysis of 3/23/79 All Holders of Safety-Related Piping Reactor OL or CP 79-07 Rupture of Radwaste Tanks 3/26/79 All power reactor facilities with an OL or CP 79-08 Interconnection of 3/28/79 All power reacto.
Contaninated Systems with facilities with an Service Air Systems Used OL and Pu Processing As the Source of Breathing fuel facilities Air 79-09 Spill of Radioactively 3/30/79 All power reactor Contaminated Resin facilities with an OL 79-10 flonconforming Pipe 4/16/79 All power reactor Support Struts facilities with a CP 79-11 Lower Reactor Vessel Head 5/7/79 All holders of Reactor Insulation Support Problen OLs and cps 426 329
IE Information flotice flo. 79-18 Enclosure July 6, 1979 Page 2 of 2 LISTIfiG OF IE IflFORMATION fiOTICES ISSUED Ifl 1979 Information Subject Date Issued To flotice !io.
Issued 79-12 Attempted Damage to flew 5/11/79 All Fuel Facilities Fuel Asserrblies Research Reactors, and Power Reactors with an OL or CP 79-13 Indication of Low Water 5/29/79 All Holders of Reactor Level in the Oyster Creek OLs and cps Reactor 79 14 flRC Position of Electrical 6/11/79 All Power Reactor Cable Support Systems Facilities with a CP 79-15 Deficient Procedures 6/7/79 All Holders of Reactor OLs and cps 79-16 f;uclear Incident at Three 6/22/79 All Research Reactors Mile Island and Test Reactor-with OLs 79-17 Source Holder Assembly Damage 6/20/79 All Holders of Reactor Damage Fron Misfit Between OLs and cps Assembly and Reactor Upper Grid Plate 426 330
.