Summary of 790523 Meeting W/Util & Ebasco at Facility Re Hydrology of Site & Environ
ML19246C439
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/08/1979
From: Benedict R
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 7907240620
Download: ML19246C439 (3)


Text

k

,(

fo UNITED STATES g

NUCLEAR REGULATORY COMMISSION 3

a a

WASHING TON, D. C. 20566

%.,,,,**8 JUN 0 81970 DOCKET NO. 50-382 APPLICANT:

LOUISIANA POWER AND LIGHT COMPANY FACILITY:

WATERFORD STEAM ELECTRIC STATION, UNIT 3

SUBJECT:

MEETING HELD ON MAY 23, 1979 On May 23, 1979, NRC staff members and a consultant visited the Waterford Unit 3 site and discussed matters concerning the hydrology of the site and environs.

An attendance list is enclosed.

The site was viewed from atop the containment building and later from the top of the levee between the plant and the Mississippi River.

Discussions with the applicant and Ebasco centered on the hydrology questions 371.05 through 371.09 that we had sent to the applicant on April 26, 1979.

The following sumarizes the applicant's comitments concerning each of these questions.

371.05 Figure 2.4-4 will be revised to show the Project Design Flood flow distribution.

371.06 Applicant's response to this question will give consideration to qualifying the cooling tower pumps for the Operating Basis Earth-quake, in which case the 20-year storm would be an adequate basis for analysis of site flooding.

371.07 The app'.icant will document both high speed and low speed hurri-cane surges.

371.08 Applicant will respond to this question.

371.09 The applicant stated that FSAR Section 9.2.5 is correct, and that the discrepancies in Section 2.4 will be corrected.

An additional item was discussed concerning the potential for river water level to be as high as 30 feet (top of levee).

NRC will develcp a fannal question on this matter.

AN R. A, Benedict Light Water Reactors Branch No. 2 Divisicn of Project Management

Enclosure:

Attendance List ces w/ enclosure:

See next page

\\b,3 5%s

JUN 0 8 Mp9 Mr. D. L. Aswell Vice President, Power ' Production Louisiana Power & Light Company 142 Delaronde Street New Orleans, Louisiana 701/4 cc:

W. Malcolm Stevenson, Esq.

Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 Mr. E. Blake Shaw, Pittman, Potts and Trowbridge 1800 M Street, N. W.

Washington, D. C.

20036 Mr. D. B. Lester Production Engineer Louisiana Power & Light Company 142 Delaronde Street New Orleans, Louisiana 70174 Lyman L. Jones, Jr., Esq.

Gillespie & Jones 910 Security Homestead Building 4900 Veterans Memorial Boulevard Metairie, Louisiana 70002 Luke Fontana, Esq.

Gillespie & Jones 824 Esplanade Avenue New Orleans, Louisiana 70116 Stephen M. Irving, Esq.

One American Place, Suite 1601 Baton Rouge, Louisiana 70825

Lh

-c

() / \\ ;

ENCLOSURE M 0 8 fSPD ATTENDANCE LIST WATERFORD 3 SITE VISIT MAY 23, 1979 LP&L R. Prados EBASCO M. Fluss D. Hunter NRC - STAFF E. Hawkins R. Benedict D. Nunn, Consultant c} (\\

\\hl

/