ML19246B989

From kanterella
Jump to navigation Jump to search
RO 79-021/01X-0 on 790710:during Performance of Maint in Steam Tunnel Area,Water Observed Dripping from Lagging on Control Rod Driveline Return.Cause Unknown
ML19246B989
Person / Time
Site: Pilgrim
Issue date: 07/11/1979
From: Mathis C
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 7907190323
Download: ML19246B989 (1)


Text