ML19246B857

From kanterella
Jump to navigation Jump to search
Responds to .Lists as-built Changes to Drawing 0999-D-07.Changes Have No Safety Significance to Cask Shock Absorber
ML19246B857
Person / Time
Site: 07105805
Issue date: 05/17/1979
From: Reynolds L
CHEM-NUCLEAR SYSTEMS, INC.
To: Macdonald C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 7907180812
Download: ML19246B857 (2)


Text

.

7/- 5 M5 l

CHEM -NUCLEAR SYSTEMS INC.

p-p /2-

', ',,' P O Hm 1866

  • BMf evue. Esh:n;gon 93009 2 (200) 827 0711
11 02

.1.

May 17,1979 Charles E. MacDonald, Chief

/ 3 ' g \\ i I /,., x

\\

N?'

Transportation Branch Division of Fuel Cycle and

[,i DCC'cra N' )

Material Safety

/

USNRC '

Y U. S. Iluclear Regula tory Comis :f on

~,

[

Uashington, D.C. 20555 U AY 2 41979 >

,;)

tugf' 3

(;.

man. 5:ci;0'y j/

Re ference:

Docket 71-5305 s' ', occm cuc Gentlemen:

D.h '

In reply to your letter dated May 10, 1979 the following inforrution is submitted for your review-Orawing No. 0999-D-07 Rev. F As-Built In formation Upper right hand corner 6-5/8" dim was 6-1/8" Lower lef t hand corner plate 59-9/16' O.D. was 59-1/2" Lower left hand corner plate 34-15/16" I.D. w is 35" Lower lef t hand corner skirt 59-5/8 - 3/4" dia. was 59-1/2" dia.

Lower left hand corner reinf. block 6 required 0 60" was 12 required 30 Upper lef t hand corner bolt 1" x 8 x 16" Lg. was 1" x 8 x 15" Lg.

Rev. G As-Buil t Informa tion Upper right hand corner bnlt 3/4 - 10 x l-l/4" Lg. with 1/8" Thk washer was 3/4 - 10 x 7/8" Lg.

Middle right hand side 3/8" eye bolt.w/ shank removed (2) required was #2 pad eye 675066 Upper middle of dwg. ney note:

Bevel for trunnion welds required Middle bottom of dwg. now note: 1.

Paint all carbon steel surfaces w/plasite #7155 Wisconsin Protective Coat System, Green Bay, Wisc., color

" i v o ry ".

Middle lef t hand side used 1/2" (stock) eye bolt w/ shank removed 7907 was #2 pad eyt

., 7 -, w

i

,_J a -

[7

The above as-built changes have no sa fet', significance to the cask shock absorber and the changes do not a ffect the SAR.

If you have further questions please do not hesitate to call or siti t c.

Sincerely, CHEM NUCLEAR SYSTEM;, INC.

J il i,

/

1

[1(AA<7

'\\0 G ouls E. Reynolds# y L

Director Regulatory Affairs LER/cm

~,

-;., e -.,

A t -, u * *,