ML19246B429

From kanterella
Jump to navigation Jump to search
Forwards LER 79-020/03L-0
Date released: 09/17/2019 Download: ML19246B429


LER 79-020/03L-0 on 790609:failure of Pressurizer power-operated Relief Isolation to Close on Demand.Caused by Torque Switch Failure in Limitorque SMB-00 Operator.Switch Replaced
ML19246B431
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 07/09/1979
From: Hunstad A
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19246B431 (1)
Forwards LER 79-020/03L-0
ML19246B428
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 07/09/1979
From: Mayer L
NORTHERN STATES POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19246B428 (1)