ML19246B293
| ML19246B293 | |
| Person / Time | |
|---|---|
| Site: | 07001100 |
| Issue date: | 05/30/1979 |
| From: | Lichtenberger H ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY |
| To: | Martin W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML19246B282 | List: |
| References | |
| NUDOCS 7907130026 | |
| Download: ML19246B293 (1) | |
Text
____
C-E Power Systemr Tel 203/688-1911 Cornoushon Enyneering. Inc.
Telex. 99297 1000 Prospect Hill Road Windsor, Connecticut 06095 POWER SYSTEMS Shy 30,1979 U. S. Nuclear Regulatory Commission Region #1 631 Park Avenue King of Pmssia, Pennsylvania 19406 Attention: 5fr. Wa.1 ter G. Shrtin, Chief Safeguards Branch Gentlemen:
This is to acknowledge and respond to your Shy 8,1979 letter which addressed itself to NRC Inspection 70-1100/79-02 and was received Shy 14, 1979.
The inspectors noted that DOE /NRC Fo ms 741 had not met the thirty day report-ing requirement. This reporting requirement, as you know, is difficult at times to meet since the values to be reported are dependent on the use of external vendor analytical values.
In addition, the scheduling receipts c.t our Windsor facil.ity has presented internal problems.
In order that this reporting requirement can be met in the future, instructions have been issued to operating personnel to schedule fuel arrivals at Windsor so that the material will be dormant for an absolute minimum after arrival.
The necessary sampling, processing, evaluating and reporting process will also be expedited in order that delays will be minimi::ed.
In addition, Windsor partial bulk or analytical values will be combined with our Hematite values by Windsor in order that the reporting requirement can be met.
Revised documents will be issued when final analytical values are received.
The inspectors also noted that in two instances the DOE /NRC Fom 741 did not show Limits of Error for each isotope line entry.
Limits of Error had been calculated and reported for the total shipment. To avoid this problem in the future, Combustion Engineering will either prepare individual DOE /NRC Fom 741's for individual enrichments or issue one document reflecting on a one line entry the total element and isotope quantities with supplemental pages contain-ing the details.
The instructions for expediting the reporting requirement for DOE /NRC Fom 741 and the reporting of Limits of Error for each line entry on the DOE /hRC were initiated as of Shrch 28, 1979.
Very tmly yours, akMh Ltts 002}
on
- d. V. Lichtenberger Vice President - Nuclear Fuel Nuclear Power Systems Division b
HVL:sas
'907130dgd