ML19246A961

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 79-08, Attempted Extortion - Low Enriched U. No Action Required
ML19246A961
Person / Time
Site: 07000824
Issue date: 05/18/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Engelder T
BABCOCK & WILCOX CO.
References
NUDOCS 7907100071
Download: ML19246A961 (1)


Text

SR RIG

/

'o UNITED STATES E ',

NUCLEAR REGULATORY COMMISSION

d dl)(f[ n e

REGION 11 t

f 101 M ARIETT A ST., N W., St>lTE 3100 o

AT L ANT A. GE oRGI A 30303

'V j

I b lb70 NY In Reply Refer To:

RII:JPO

.-70-824 Babecck and Wilcox Company Attn:

Dr. Theodore C. Engelder, Director Lynchburg Research Center Research and Development Division P. O. Box 1260 Lynchburg, Virginia 24505 Gentlemen:

The enclosed IE Circular 79-08, is forwarded to you for inforr.ation.

If there are any questions related to the contents or intent of the Circular or its attach =ents, pler.se contact this office.

Sincerely, Q

s ;

_s,.

y James P. O'Reilly Director

Enclosures:

IE Circular No. 79-08 w/ attachments 7 j

~7 1 e) j JIJ 16I IUDY100 07 j p f62

o a

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 May 18, 1979 IE Circular No. 79-08 ATTEMPTED EXTORTION - LOW ENRICHED URANIUM

Background

In January 1979, a temporary contractor employee who was working at the General Electric plant in Vilmington, North Carolina, allegedly entered the plant and removed a crum containing two 5-gallon cans of low enriched

'aranium from the faality with the intention of extorting money for the return of the er'.erial.

The Federal Bureau of Investigation conducted an intensive investigation leading to the arrest of the employee on February 1, 1979. All material was recovered and returned to the plant.

Discussion Based on preliminary information provided the NRC, the theft was allegedly carried out in the following manner:

On Friday, January 26, 1979, the subject worked the day shift.

At 10:50 p.m. the same day he drove back to the plant and entered with the night shift. He showed his Florida driver's license at the ectrance gate instead of his yellow contractor badge because it had a blue background similar to that on the picture badge which he thought was required to gain access to the area of the plant that he wanted to penetrate. He had allegedly gained access using his driver's license on previous occasions.

Once inside the plant, the subject would have been guided by gates and fences into a parking area had it not been for the fact that one gate had been removed to allow installation of truck scales.

He proceeded down the unprotected road to an area adjacent to the building he wanted to enter.

After the subject entered the building through a personnel door, he proceeded to his normal working station which was the Chem Tech Lab and entered, using his own key.

In the lab he picked up his protective clothing, a two vaeel cart used to move 55 gallon drums and a container used to ship chemicals. The container could hold two 5 gallon cans.

He then proceeded to a door leading up a stairvell into the radiation m

.._,s..

m.

_ _ _.j m _

DUPLICATE DOCUMENT Entire document previously entered

. <) ')

into system under:

ANO h

hh No. of pages:

.... _. _