ML19246A717
| ML19246A717 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 08/23/2019 |
| From: | David Gudger Exelon Generation Co |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| JAFP-19-0078, SFGL-12 | |
| Download: ML19246A717 (2) | |
Text
AS" 1
.4ilW?lk,4;ti,r
-fit?:£:? Exelon Generation JAFP-19-0078 August 23, 2019 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 200 Exelon Way Kennett Square. PA 19348 www.exeloncorp.com 10 CFR 50.54(q)(5) 10 CFR 50.4 10 CFR 72.44(f)
James A. FitzPatrick Nuclear Power Plant Renewed Facility Operating License No. DPR-59 Docket No. 50-333 James A. FitzPatrick Nuclear Power Plant Independent Spent Fuel Storage Installation General License SFGL-12 Docket No.72-012
Subject:
Exelon Generation Company Emergency Plan Document Revisions In accordance with 10 CFR 50.4(b)(5), "Emergency Plan and related submissions," Exelon Generation Company, LLC (Exelon) is submitting Emergency Plan document revisions listed in the table below for the James A. FitzPatrick Nuclear Power Plant (JAF).
Procedure No.
Revision Title EP-AA-1014, Addendum 3 1
James A. FitzPatrick Nuclear Power Plant Erner, enc Action Levels EP-AA-1014, Addendum 3 2
James A. FitzPatrick Nuclear Power Plant Erner, enc Action Levels EP-AA-1014, Addendum 3, Appendix 1 0
JAF EAL Wallboard EP-AA-1014, Addendum 3, Appendix 1 1
JAF EAL Wallboard IAP-2, Figure IAP-2.1 (Superseded) 12 EAL Classification Matrix The changes to the Emergency Plan documents listed were evaluated under the requirements of 1 o CFR 50.54(q) and were determined not to result in a reduction in the effectiveness of the Emergency Plan for JAF. This notification is being submitted within 30 days of implementation
. 15 of the Emergency Plan document changes as required by 10 CFR 50.54(q)(5).
,A- /... 4-
)1/;.J ~ 5 Z(p
/iltf/(_
IUA./55
U.S; Nuclear Regulatory Commission Emergency Plan Document Revisions NRC Docket Nos. 50-333 and 72-012 August 23, 2019 Page2 The changes continue to meet the applicable emergency planni.ng standards established in 1 O CFR 50.47(b) and 10 CFR 50, Appendix E.
In addition, as required by 1 O CFR 50.54(q)(5), Attachment 1 of this submittal includes a summary analysis of the changes to the Emergency Plan documents.
This submittal also satisfies the reporting requirements associated with 1 O CFR 72.44{f), which stipulates that within six months after any change is made to the Emergency Plan, the licensee shall submit a report containing a description of the changes to the Director, Division of Spent Fuel Management.
Copies of the revised Emergency Plan documents are included in the attachments noted to this letter. Copies of superseded documents are not attached..
There are no regulatory commitments in this submittal.
If you have any questions or require additional information, please contact Richard Gropp at (610) 765-5557.
Respectfully, J~.J T J_Jyt--
David T. Gudger Sr. Manager, Licensing Exelon Generation Company, LLC Attachments:
- 1. 1 O CFR 50.54(q)(5) Change Summary Analysis
- 2. EP-AA-1014, Addendum 3, Revision 1, "James A. FitzPatrick Nuclear Power Plant Emergency Action Levels"
- 3. EP-AA-1014 Addendum 3, Revision 2, "James A. FitzPatrick Nuclear Power Plant Emergency Action Levels"
- 4. EP-AA-1014, Addendum 3, Appendix 1, Revision 0, "JAF EAL Wallboard"
- 5. EP-AA-1014, Addendum 3, Appendix 1, Revision 1, "JAF EAL Wallboard" cc:
w/ Attachment 1 only Regional Administrator-NRC Region I Director, NRC Division of Spent Fuel Management, ONMSS NRC Project Manager, NRR - James A. FitzPatrick Nuclear Power Plant NRC Project Manager, NRR - James A: FitzPatrick Nuclear Power Plant A. L. Peterson, NYSERDA B. Frymire, NYSPSC J